My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1994-1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_1994-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 9:24:25 AM
Creation date
7/3/2020 11:08:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1994-1998
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1990-1994.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(2/94) <br /> Sec. 10-1, Construction Details <br /> Std. Spec. Sec. 19 <br /> Special <br /> Page 2 of 4 <br /> The clay barrier layer (barrier) shall be constructed as follows: <br /> A on-site selected soil shall be placed on the finished <br /> foundation layer. <br /> B. on-site selected soil shall be spread over the finished <br /> foundation layer in a single loose layer of <br /> approximately 13 inches. (The 13-inch thickness may be <br /> adjusted to allow for a final compacted barrier layer <br /> of 12 .5 inches minimum. ) <br /> C The 20 percent imported lone clay shall be spread <br /> evenly over the uncompacted ,13-inch loose lift. This <br /> should give an uricompacted clay depth of approximately <br /> 3 inches. <br /> As a guide for determining necessary quantities of lone <br /> clay, a 500-foot x 500-foot square area will require <br /> approximately 3,500 Tons. <br /> The Contractor shall not begin premixing until the <br /> Engineer has approved the spreading of lone clay. <br /> D. A motorized pug mill mixer capable of injecting water <br /> into the mixing chamber at a controlled rate (CAT RR- <br /> 250 Soil Stabilizer, or approved equal) shall be used <br /> to initially break the 20 percent imported lone clay <br /> clods and to mix the soil. The mixer shall have a <br /> minimum mixing depth of 16 inches and shall be equipped <br /> with "bullet" cutting teeth. The mixing chamber shall <br /> be set to a depth of approximately 4 inches and the <br /> mixing bar shall rotate at a minimum speed of 160 rpm. <br /> A minimum of two passes (premixing) shall be made with <br /> the mixer without adding any moisture to break the 20 <br /> percent imported lone clay clods. Premixing shall <br /> continue until a maximum of 10 percent is retained on a <br /> 3/4-inch sieve. Cobbles and cemented particles larger <br /> than 1 1/2 inches, and foreign material, shall be <br /> removed by the Contractor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.