My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 2:21:54 AM
Creation date
7/3/2020 11:08:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1994
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1994.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
scales. The ppm scale was used for structure monitoring. The <br /> instrument was calibrated with a 2. 5% methane mixture and was <br /> warmed up for approximately 10 minutes prior to monitoring. The <br /> methane level in open air at the labor camp varied from 0 - 20 <br /> ppm. <br /> Each building contains two apartments. Monitoring consisted of a <br /> complete walk-through of each apartment with an emphasis on <br /> incoming plumbing, electrical outlets, baseboards, behind stoves, <br /> ' and cracks (if encountered) . In addition, vents on the roofs of <br /> two buildings were monitored. <br /> Results of the structure monitoring are shown on Table 1. <br /> Fifteen structures were monitored. The first 12 structures <br /> listed on table 1 are along the east edge of the labor camp from <br /> north to south. Structures 13-15 are along the north edge from <br /> east to west. Due to the low levels found in structures 1-15, <br /> the remainder of the structures were not monitored. <br /> ' Structure monitoring of the farm labor camp will continue on a <br /> quarterly basis. Therefore, the next monitoring event is <br /> scheduled for March 29, 1993 . <br /> ON SITE STRUCTURES <br /> The scale house was removed from the site in December, 1992 . The <br /> ' off ice/maintenance shed was monitored for methane on 12\15\93 <br /> The methane reading was approximately 20 ppm. Monitoring will <br />
The URL can be used to link to this page
Your browser does not support the video tag.