My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 2:21:54 AM
Creation date
7/3/2020 11:08:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1994
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1994.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
continue on a quarterly basis throughout the postclosure period. <br /> Monitoring frequency and parameters being tested may be increased <br /> as necessary or as directed by the Local Enforcement Agency or the <br /> CIWMB. The labor camp structures are monitored monthly from May - <br /> October and quarterly from November April. <br /> Monitoring results have been presented in the form of a report to <br /> the Local Enforcement Agency and the CIWMB within 90 days of the <br /> sampling event. Monitoring reports through March, 1994 are <br /> included as appendix B. Monitoring and Reporting will continue on <br /> a quarterly basis for gas wells. Labor camp structure monitoring <br /> results will be submitted to the LEA and CIWMB within 15 days of <br /> monitoring. <br /> Monitoring results at the perimeter monitoring wells indicate that <br /> methane levels exceed the regulatory limits. As a result, the <br /> County is in the process of designing a landfill gas control system <br /> to bring perimeter methane levels into compliance. <br /> VII EQUIPMENT - QA/QC <br /> Monitoring is accomplished using a Gas Tech Landfill Monitor which <br /> is capable of measuring methane concentrations in parts per million <br /> or percent. Wells will be monitored for methane only unless <br /> otherwise specified by the LEA, the RWQCB, and/or the CIWMB. The <br /> ppm scale is used for structure monitoring. The instrument is <br /> ' calibrated with a 2 .5% methane mixture for the ppm scale, 50% <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.