My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 2:21:54 AM
Creation date
7/3/2020 11:08:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1994
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1994.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V <br /> 91 NOV 4 P 03 <br /> mcon CPT. OF PUBLIC WORKS <br /> SSOCIATES <br /> nsuttants in Wastes November 1 1991 <br /> Management and <br /> Environmental Control Pr-bject 939-01.09 <br /> Mr. Gabriel Karam, P.E. <br /> County of San Joaquin <br /> Department of Public Works <br /> 1810 East Hazelton Avenue <br /> Stockton, California 95201 <br /> Re: Decommissioning and installation of gas moMffMnd91T . <br /> y ` ea <br /> Dear Mr. Karam: <br /> EMCON Associates (EMCON) is pleased to submit this letter report on the <br /> decommissioning of single-level gas wells and the installation and sam- <br /> pling of tri-level soil-gas wells at San Joaquin County's Harney Lane Land- <br /> 1011 fill in Lodi, California (figure 1). The tri-level wells were installed to allow <br /> lateral migration of methane from the landfill to be detected, in compliance <br /> with closure/postclosure maintenance requirements contained in California <br /> Code of Regulations Title 14. This report describes the procedures used <br /> in well installation, decommissioning, and monitoring, and discusses the <br /> data obtained•from the initial monitoring of the new wells. <br /> 1 SOIL-GAS PROBE DECOMMISSIONING PROCEDURES <br /> EMCON decommissioned five existing gas wells (P-2, P-5, P-6, P-7, and <br /> P-10) at the Harney Lane Landfill on October 11, 1991. Two other existing <br /> gas wells scheduled for decommissioning (P-1 and P-8) could not be <br /> located. Both the existing and the proposed well locations were deter- <br /> mined by the County and are shown in figure 2. To decommission each <br /> well, the probe casing was first pulled from the ground. The original well <br /> boring site was then redrilled to a depth at which native soil, rather than <br /> well construction material, returned to the surface on the auger, indicating <br /> that the .bottom of the original boring had been reached. The borehole <br /> was then filled to the surface with a nine-sack concrete slurry. <br /> PJ9 9390109.GOW <br /> L <br /> VIM! Ringwood Avenue, San Jose, California 95131,.(408)453-7300 <br />
The URL can be used to link to this page
Your browser does not support the video tag.