My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 2:21:54 AM
Creation date
7/3/2020 11:08:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1994
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1994.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1 lists the structures that were monitored during the <br /> April 21, 1992 event. All structures along the boundary between <br /> the landfill and the labor camp (17) were monitored for methane. <br /> Each structure is divided in half, so the results in Table 1 are <br /> reported as east or west half. In addition, each structure has a <br /> built in venting system that exits through the roof. Three of the <br /> vents were monitored for methane. <br /> One labor camp monitoring event remains. However, the housing <br /> units in the farm labor camp are currently occupied. The Housing <br /> Authority has verbally declined access into the structures to <br /> perform the final monitoring event. The County sent a letter to <br /> the Housing Authority requesting permission to access the <br /> structures by August 11, 1992 . The Housing Authority did not <br /> responded to our written request. Therefore, the final monitoring <br /> event for the labor camp structures was not performed. <br /> ON-SITE STRUCTURE AND GAS PROBE MONITORING <br /> On June 25, 1992 , and August 11, 1992 , the County performed probe <br /> and on-site structure monitoring. The methane concentrations were <br /> similar to those found in previous monitoring events. The results <br /> are contained in Tables 2 and 3 . <br /> The following is an anticipated monitoring schedule to finish the <br /> monthly monitoring required according to the letter from the <br /> Environmental Health Division, dated December 19, 1991. <br /> ANTICIPATED MONITORING SCHEDULE <br /> * Perform 5th probe monitoring event September 11, 1992 <br /> * Perform final probe monitoring event October 11, 1992 <br /> * Perform final labor camp event If and when access <br /> is approved <br /> This presents the Landfill Gas Monitoring Report for the Harney <br /> Lane Sanitary Landfill. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.