My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 2:21:54 AM
Creation date
7/3/2020 11:08:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1994
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1994.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Harney Lane Sanitary Landfill is located on Harney Lane <br /> approximately 7 miles east of Lodi (Figure 1) . A Migrant Farm <br /> Labor Camp is located adjacent to the landfill along the western <br /> boundary. The structures in the labor camp are occupied part of <br /> the year by farm workers. <br /> ' In accordance with closure regulations, a network of perimeter gas <br /> monitoring wells was installed by EMCON Associates in October, 1991 <br /> (Figure 2) . The wells are no more than 1000 feet apart and are <br /> ' spaced much closer than 1000 feet along the boundary with the labor <br /> camp to ensure detection of possible methane migration toward the <br /> structures. Each well contains three monitoring probes set at <br /> varying depths. According to closure regulations, the wells are to <br /> be monitored quarterly for methane. However, the letter dated <br /> December 19 , 1991 from the Local Enforcement Agency (LEA) requires <br /> six monthly gas monitoring events for the perimeter landfill gas <br /> monitoring wells. In addition, the LEA required three monthly <br /> events for on-site structures, and farm labor camp structures. <br /> STRUCTURE MONITORING <br /> On September 11, 1992 , San Joaquin County performed the final <br /> monthly labor camp monitoring. Present during monitoring were <br /> Jerry Wickes of the San Joaquin County Environmental Health <br /> Division, and Robert Reed of the County Housing Authority. <br /> The equipment used was a Gas Tech Landfill Monitor equipped with <br /> parts per million (ppm) , Lower Explosive Limit (5%) , and 100% gas <br />
The URL can be used to link to this page
Your browser does not support the video tag.