Laserfiche WebLink
LIST OF FIGURES <br /> Figure 1 -- Landfill Location map. . . . . . . . . . . . . . . . . . . . . . . . . . . .2 <br /> Figure 2 -- Pre-Closure and Closure Schedule. . . . . . . . . . . . . . . . . 6 <br /> Figure 3 -- Universal Soil Loss Equation. . . . . . . . . . . . . . . . . . . . 12 <br /> DRAWINGS (FINAL PLANS) <br /> Plan Sheet No. <br /> Drawing 1 -- Landfill Closure Grading Plan . . . . . . . . . . . . .2 <br /> Drawing 2 -- Gas & Groundwater Well & Structure <br /> Location Map.3 <br /> Drawing 3 -- Borrow Site Grading and Excavation Plan . . .4 <br /> Drawing 4 -- Construction Detail Drawings . . . . . . . . . . . . . .5 <br /> Drawings 5, 6 -- Landfill Cross Sections . . . . . . . . . . . . . . . . . 6,7 <br /> Drawing 7 -- Borrow Site Cross Sections. . . . . . . . . . . . . . . . .8 <br /> Drawing8 -- Boundary Map. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9 <br /> APPENDICES <br /> Appendix A -- Waste Discharge Requirements <br /> Appendix B -- Slope Stability Analysis <br /> Appendix C -- Construction Quality Assurance Program <br /> Appendix D -- Drainage Calculations <br /> Appendix E -- Groundwater Monitoring Implementation Plan <br /> Appendix F -- Gas Well Installation Report <br /> Appendix G -- Article 5 Financial Assurance Document <br /> Appendix H -- Test Pad Documentation <br /> Appendix I -- Landfill Gas Monitoring <br /> Appendix J -- Pledge of Revenue Agreement <br />