Laserfiche WebLink
ICLEINFELDER <br /> Kleinfelder has completed a mix design for the borrow soil to be used for the barrier layer. <br /> Kleinfelder, as CQA Monitor, may modify the mix design during construction should there be <br /> ® a change in the quality of import clay, equipment operations, or other factors. <br /> Kleinfelder will compile all the CQA testing data for the project in the final CQA report, <br /> certify construction of the barrier layer, and compile a site map to scale showing the location <br /> and results of all CQA testing. The map can be correlated to the as-built drawings produced <br /> by the SJDPW. <br /> Any changes to engineering during the project will be approved by the County Project <br /> Engineer and coordinated with the CQA Officer. <br /> 2.8 FIELD OBSERVATIONS <br /> Part time field observation of construction of the entire final cover will be provided by SJDPW <br /> field engineers. In addition, a construction foreman will be present at all times. <br /> Kleinfelder will provide limited construction observation of the foundation and vegetative <br /> layers, and part time observation of construction of the barrier layer. <br /> The SJDPW will keep daily logs and provide summary reports to Kleinfelder for the duration <br /> of the project and coordinate field observation scheduling with Kleinfelder. <br /> i <br /> CSM.md 3EI94 Page 8 of 24 <br /> Copyright 1994 Kleinfelder,Inc. <br />