My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 3:54:32 AM
Creation date
7/3/2020 11:08:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1995
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1995.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLEINFELDER <br /> 9 NONCONFORMANCE <br /> ® Any deficiencies or failed tests shall be recorded on the daily log. Deficiencies or failed areas <br /> that are corrected and retested that day shall be marked as corrected on the daily log and no <br /> separate Nonconformance Report is required. <br /> When a tested area of deficiency or nonconformance has not been brought into conformance, <br /> or has not been tested for conformance by the QA/QC technician by the time the technician <br /> leaves the site for the day, a separate Nonconformance Report shall be written. <br /> An area of nonconformance shall not be left more than five days without being brought into <br /> conformance, unless approved by the Engineer. In the case of delayed conformance, a <br /> Delayed Conformance Report shall be prepared by the QA/QC technician and kept in a <br /> separate file. <br /> After bringing an area to conformance, the conformance shall be recorded on the daily log and <br /> on the original Nonconformance Report and Delayed Conformance Report with the date of <br /> conformance and the confirming test results. <br /> In the event of a failing test, all material for the lift being tested extending to the adjacent <br /> passing tests shall be removed and/or reworked until passing tests are obtained. At least two <br /> passing tests shall be obtained in each reworked area for each failing test. <br /> GSM.-MD 3EI94 Page 23 of 24 <br /> Copyright 1994 Kleinfelder,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.