My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 3:54:32 AM
Creation date
7/3/2020 11:08:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1995
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1995.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
kTj KLEINFELDER <br /> File No. 20-1008-49.001 <br /> August 19, 1994 <br /> SUMMARY OF DAILY SDRI READINGS <br /> Elapsed <br /> Time Average <br /> Between Weight Water <br /> Reading Change Temperature Permeability <br /> Date (hours) (grams) (Degrees F) (cm/sec) <br /> 8/10/93 23.43 141.3 78 4.4x10$ <br /> 8/11/93 27.93 97.4 80 2.6x101 <br /> 8/12/93 21.77 226.0 82 7.6x10-$ <br /> 8/15/93 70.43 237.5 82 2.5x108 <br /> 8/16/93 24.40 157.7 82 4.7x108 <br /> 8/17/93 23.63 146.1 81 4.5x108 <br /> 8/18/9324.05 140.4 80 4.3x10-8---]I <br /> CONCLUSIONS <br /> Based on the results of our laboratory and SDRI permeabilities, it appears that the test pad met <br /> permeability and moisture/density specifications. We recommend that the revised CQA Plan <br /> procedure for barrier construction is to be used with the following exception. The barrier layer <br /> may be constructed in a single-lift process provided compaction is performed by a CAT 825C <br /> sheepsfoot compactor, or equivalent, with a minimum of 14 passes at a moisture content of at <br /> least 3 percent over optimum. <br /> GSM:md 13/94 <br /> Copyright 1994 KLeinfelder, Inc. Page 6 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.