My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 3:54:32 AM
Creation date
7/3/2020 11:08:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1995
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1995.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drainage facilities consist of overside drain pipes, and top and <br /> bottom perimeter ditches which convey stormwater runoff to the <br /> detention basins. <br /> This report presents the Final Documentation Report for the final <br /> cover for the Harney Lane Sanitary Landfill and complies with state <br /> closure regulations Title 14 , Chapter 3 , Article 7 . 8 . This report <br /> contains all information pertinent to demonstrate that the CQA plan <br /> was implemented as proposed and that the final cover construction <br /> was completed in accordance with the design criteria, plans, and <br /> specifications pursuant to Title 14 , Chapter 5 , Article 3 . 4 , <br /> Section 18275 . <br /> FINAL COVER <br /> Final cover at the Harney Lane Sanitary Landfill was applied to <br /> approximately 94 acres, which is the area that is filled with <br /> refuse. Final cover consists of a minimum two foot foundation <br /> layer overlain by a one foot thick clay barrier layer and a one <br /> foot thick vegetative layer (Figure 2) . Soils from the auxiliary <br /> detention basin/soil borrow area (Drawing 1) were used in the <br /> construction of the foundation and vegetative layers. The clay <br /> barrier layer consists of select borrow area soils mixed with <br /> II' imported Ione clay to meet the required specifications . All soil <br /> was placed with rubber-tired .scrapers unless otherwise noted. All <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.