Laserfiche WebLink
Drainage facilities consist of overside drain pipes, and top and <br /> bottom perimeter ditches which convey stormwater runoff to the <br /> detention basins. <br /> This report presents the Final Documentation Report for the final <br /> cover for the Harney Lane Sanitary Landfill and complies with state <br /> closure regulations Title 14 , Chapter 3 , Article 7 . 8 . This report <br /> contains all information pertinent to demonstrate that the CQA plan <br /> was implemented as proposed and that the final cover construction <br /> was completed in accordance with the design criteria, plans, and <br /> specifications pursuant to Title 14 , Chapter 5 , Article 3 . 4 , <br /> Section 18275 . <br /> FINAL COVER <br /> Final cover at the Harney Lane Sanitary Landfill was applied to <br /> approximately 94 acres, which is the area that is filled with <br /> refuse. Final cover consists of a minimum two foot foundation <br /> layer overlain by a one foot thick clay barrier layer and a one <br /> foot thick vegetative layer (Figure 2) . Soils from the auxiliary <br /> detention basin/soil borrow area (Drawing 1) were used in the <br /> construction of the foundation and vegetative layers. The clay <br /> barrier layer consists of select borrow area soils mixed with <br /> II' imported Ione clay to meet the required specifications . All soil <br /> was placed with rubber-tired .scrapers unless otherwise noted. All <br /> 3 <br />