My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2005-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_2005-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 11:03:37 AM
Creation date
7/3/2020 11:09:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2005-2007
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_2005-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reseed Surface Compact Veg <br /> Layer Material <br /> Backfill interface <br /> with granular <br /> bentonite <br /> Remove Veg Layer Material <br /> Vegetative Layer from erosion cut prior to <br /> (Thickness varies, 12"to 24) placing GCL <br /> Nail GCL to <br /> excavation wall <br /> Do not nail at base. <br /> f Install GCL in <br /> Clay Barrier Layer , <br /> (24"Thick Min. Contact with Exist <br /> y } <br /> at this location) Clay Barrier <br /> 11r., a - <br /> Foundation Soil <br /> OPTION 1: EXCAVATION WITH BACKHOE <br /> Remove Veg Layer Material <br /> from erosion cut prior to <br /> placing GCL <br /> Reseed Surface <br /> Compact Veg <br /> Layer Material <br /> s a <br /> Vegetative Layer Backfill interface <br /> with ranular <br /> (Thickness varies, 12 to 24) g <br /> gam° bentonite <br /> " Nail GCL to <br /> dr_ <br /> 6"_ Ain excavation wall. <br /> " f Do not nail at base. <br /> ff a <br /> 4 <br /> AP <br /> Clay Barrier Layer ' - r Install GCL in Contact <br /> (24"Thick Min. with Exist Clay Barrier <br /> at this location) <br /> x <br /> Foundation Soil <br /> OPTION 2: EXCAVATION WITH BULLDOZER <br /> COUNTY OF SAN NO SCALE JOA UIN HARNEY LANE PROPOSED CAP <br /> Q SANITARY LANDFILL REPAIR OPTIONS FIG s <br />
The URL can be used to link to this page
Your browser does not support the video tag.