My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2005-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_2005-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 11:03:37 AM
Creation date
7/3/2020 11:09:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2005-2007
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_2005-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.7.1.5. Slope Placement- When covering GCL on sloped areas, cover soil <br /> should be pushed up-slope to minimize tension on the GCL. <br /> 4.7.2. Geosynthetic Cover - Precautions shall be taken to prevent damage to the GCL <br /> by restricting the use of heavy equipment over the liner system. <br /> 4.7.2.1. Equipment- Installation of the overlying geosynthetic component can <br /> be accomplished through the use of lightweight, rubber-tired <br /> equipment such as a 4-wheel all-terrain vehicle (ATV). This vehicle <br /> can be driven directly on the GCL, provided the ATV makes no <br /> sudden stops, starts, or turns. <br /> 4.7.2.2. Placement- Smooth HDPE may be dragged across the GCL surface <br /> with equipment or by hand labor during positioning. Similarly,the <br /> HDPE may be unrolled with the use of low ground pressure <br /> equipment. <br /> 4.7.2.3. Use of Textured Liners - If a textured geomembrane is placed over the <br /> GCL, a slip sheet(such as 20-mil smooth HDPE)may first be placed <br /> over the GCL in order to allow the geomembrane to slide into its <br /> proper position. Once the overlying geomembrane is properly <br /> positioned,the slip-sheet shall be carefully removed paying close <br /> attention to avoiding any movement to the geomembrane. <br /> 5.0 ACTIVATION - If the GCL will be utilized for the control of non-aqueous phase liquids, <br /> prehydration may be necessary. The GCL manufacturer shall be contacted for these <br /> cases for site specific recommendations. <br /> 6.0 WARRANTY - GCL material as well as installation warranties provided by the <br /> manufacturer and installer shall be made a part of the final submittal documents. <br /> END OF SECTION <br /> Bentofix Drop-In Specification Bentofix is a registered trademark of NAUE GmbH&Co.KG <br /> 12 RI/13/06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.