Laserfiche WebLink
Job 07200096.01 <br /> Second Quarter 2006 <br /> Table 2. Structure Roof Vent Monitoring <br /> Harney Lane Landfill Site <br /> Measurements Performed April 14, 2006 <br /> Methane Gas* Oxygen Gas* <br /> Location/Description Time [PPM] [%-Vol] Remarks <br /> Structure 1 07:35 ND 20.9 <br /> Structure 2 07:37 ND 20.9 <br /> Structure 3 07:39 ND 20.9 <br /> Structure 4 07:42 ND 20.9 <br /> Structure 5 07:45 ND 20.9 <br /> Structure 6 07:48 ND 20.9 <br /> Structure 7 07:52 ND 20.9 <br /> Structure 8 07:59 ND 20.9 <br /> Structure 9 08:01 ND 20.9 <br /> Structure 10 08:04 ND 20.9 <br /> Structure 11 08:07 ND 20.9 <br /> Structure 12 08:09 ND 20.9 <br /> Structure 13 08:11 ND 20.9 <br /> Technician/Meteorological Conditions <br /> 04/14/06 Technicians -A. Svorinich/K Crawford, Temperature-55, Barometric pressure -30.3, Weather- Partly Cloudy, Wind-5-10 mph <br /> ND=None Detected <br /> %-LEL= Percent Lower Explosive Limit <br />