My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2005-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_2005-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 11:03:37 AM
Creation date
7/3/2020 11:09:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2005-2007
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_2005-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HEALTH OEPARTMENT <br /> 'OPquN co SAM JA V 1N COUNTY Y <br /> y Donna K. Heran, R.E.H.S. Unit Supervisors <br /> Director 304 East Weber Avenue,Third Floor Carl Borgman,R.E.H.S. <br /> e'•, 'e Laurie A. Cotulla, R.E.H.S. Stockton,California 95202-2708 Mike Huggins, R.E.H.S., R.D.I. <br /> C, e•P Program Manager Telephone: (209)468-3420 Douglas W.Wilson, R.E.H.S. <br /> Margaret Lagorio,R.E.H.S. <br /> Fax: (209)464-0138 Robert McClellon, R.E.H.S. <br /> Website:www.sjgov.org/ehcl/ Jeff Carruesco, R.E.H.S. <br /> June 7, 2006 <br /> Michael Carroll <br /> Sr. Civil Engineer <br /> County of San Joaquin <br /> Department of Public Works <br /> P.O. Box 1810 E. Hazelton Ave. <br /> Stockton, CA 95201-3018 <br /> SUBJECT: Work plan for the repair of the Clay Barrier Layer at Harney Lane Landfill,(SWIS#39-AA- <br /> 0003). <br /> This letter is regarding the above referenced document that was submitted to the Environmental Health <br /> Department(EHD) on May 4, 2006. The EHD has reviewed the document and has the following <br /> comments: <br /> 1. Figure 3 in the plan shows that the GCL is secured by being nailed into the excavation wall <br /> through an interface backfilled with bentonite. Nailing the GCL to the excavation wall (and <br /> backfilled interface) is not acceptable. Revise plan to include the GCL to be overlapped on top <br /> of Clay Barrier at a sufficient length(at least 12 inches at both sides from the excavation)to <br /> provide an adequate seal for the repair. The vegetative soil located above the overlapped area <br /> shall be removed to allow the GCL to be positioned. The Vegetative layer shall then be placed <br /> back on top of the GCL. <br /> 2. Obtain approval by the RWQCB prior to start of any repair work. <br /> Please submit to the EHD corrections that address the above noted. If you have any questions regarding <br /> this matter you may contact Frank Girardi Senior RENS at(209) 953-7868. <br /> Robert McClellon, Supervisor R.E.H.S. <br /> Environmental Health Department <br /> CC: Michael Wochnick,CIWMB,MS-20 <br /> Gino Yekta, CIWMB, MS-20 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.