My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2005-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_2005-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 11:03:37 AM
Creation date
7/3/2020 11:09:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2005-2007
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_2005-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Dan Johnson <br /> April 18, 2007 <br /> Page 2 <br /> Gas monitoring well testing procedures are as follows: <br /> ® Connect sample tubing, open test valve, observe pressure and record data. <br /> • For probes 20 feet deep or less,turn on sample pump, observe and record methane, <br /> oxygen, and carbon dioxide gas concentrations, when readings have stabilized for <br /> 30 seconds. <br /> • For probes more than 20 feet deep, turn on sample pump, extract a minimum of one <br /> probe volume, observed and record methane, oxygen, and carbon dioxide gas <br /> concentrations,when readings have stabilized for 30 seconds. <br /> • Close test valve, disconnect sample instruments and secure sample location. <br /> SCS monitored structure vent risers as directed by the County. Other required monitoring <br /> documentation(e.g., sampling personnel, date,time and meteorological conditions) is shown on <br /> the attached testing data tables. Instrument calibration logs are attached to this report. <br /> Gas Monitoring Well Testing <br /> In accordance with the approved testing schedule, all perimeter GW probes are to be tested at a <br /> minimum, on a quarterly basis. On March 16, 2007, all compliance perimeter monitoring probes <br /> defined as GW Nos. 1 through 12 were tested. Results of GW probe testing (shown on Table 1) <br /> indicated that all GW probes exhibited methane gas concentrations below the LEL (5 percent by <br /> volume) or no methane gas was detected. SCS will continue to monitor all probes quarterly as <br /> directed by the County. SCS is scheduled to perform second quarterly monitoring of 2007 (April <br /> through June)of all the GW probes before the end of the month of June 2007. <br /> Structure Vent Riser Testing <br /> In accordance with the approved testing schedule,the structure vent risers are to be tested on a <br /> quarterly basis. On March 16, 2007, all vent risers were tested for the presence of methane gas. <br /> Test results (shown on Table 2) indicated no methane gas was detected at any structure vent riser <br /> location tested. SCS is scheduled to perform second quarterly monitoring of 2007 (April through <br /> June)of the structure vent risers before the end of the month of June 2007. <br />
The URL can be used to link to this page
Your browser does not support the video tag.