My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2010-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_2010-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 12:33:43 PM
Creation date
7/3/2020 11:09:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2010-2011
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_2010-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br /> Natalia Subbotnikova [EH] <br /> From: Jaime Perez Operez@sjgov.org] <br /> Sent: Tuesday, September 21, 2010 3:36 PM <br /> To: Natalia Subbotnikova[EH] <br /> Cc: Desi Reno; Michael Carroll; Dan Johnson; Joyesh Chandra; Marcus Davenport; Jo Baker; Jack <br /> Thompson; Diego Chavez; Felipe Maldonado; Wilfrido Garcia; Billy Baier <br /> Subject: HARNEY LANE SANITARY LANDFILL <br /> Good afternoon Natalia, <br /> This is just a quick update on the status of the work at the Harney Lane Sanitary <br /> Landfill. To date, the following work has been completed: <br /> 1. The north & south ditches on the secondary site were filled/re-graded. <br /> 2. The area on the southeast side of the primary site where water ponded this past <br /> winter has been re-graded and a down drain installed. <br /> The above work was done to take care of the 2010 2nd Quarter Violation/AC cited in your <br /> June 21St inspection report. <br /> Tentatively, West Backhoe Services is scheduled to begin re-grading/filling the center <br /> roadway between the primary and secondary sites on Monday, September 27th. This <br /> work should be completed sometime in October. Once it's completed, I'll let you know. <br /> If you have any questions, please let me know. <br /> Thank you. <br /> TOGETHER WE ACHIEVE THE EXTRAORDINARY <br /> Jaime L. Perez <br /> Solid Waste Operations Manager <br /> County of San Joaquin <br /> Department of Public Works - Solid Waste Division <br /> P.O. Box 1810 <br /> Stockton, CA 95201 <br /> = 209.468.3066 <br /> F = 209.468.3078 <br /> 9/21/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.