Laserfiche WebLink
Page 1 of 1 <br /> Natalia Subbotnikova [EH] <br /> From: Jaime Perez Operez@sjgov.org] <br /> Sent: Tuesday, September 21, 2010 3:36 PM <br /> To: Natalia Subbotnikova[EH] <br /> Cc: Desi Reno; Michael Carroll; Dan Johnson; Joyesh Chandra; Marcus Davenport; Jo Baker; Jack <br /> Thompson; Diego Chavez; Felipe Maldonado; Wilfrido Garcia; Billy Baier <br /> Subject: HARNEY LANE SANITARY LANDFILL <br /> Good afternoon Natalia, <br /> This is just a quick update on the status of the work at the Harney Lane Sanitary <br /> Landfill. To date, the following work has been completed: <br /> 1. The north & south ditches on the secondary site were filled/re-graded. <br /> 2. The area on the southeast side of the primary site where water ponded this past <br /> winter has been re-graded and a down drain installed. <br /> The above work was done to take care of the 2010 2nd Quarter Violation/AC cited in your <br /> June 21St inspection report. <br /> Tentatively, West Backhoe Services is scheduled to begin re-grading/filling the center <br /> roadway between the primary and secondary sites on Monday, September 27th. This <br /> work should be completed sometime in October. Once it's completed, I'll let you know. <br /> If you have any questions, please let me know. <br /> Thank you. <br /> TOGETHER WE ACHIEVE THE EXTRAORDINARY <br /> Jaime L. Perez <br /> Solid Waste Operations Manager <br /> County of San Joaquin <br /> Department of Public Works - Solid Waste Division <br /> P.O. Box 1810 <br /> Stockton, CA 95201 <br /> = 209.468.3066 <br /> F = 209.468.3078 <br /> 9/21/2010 <br />