Laserfiche WebLink
• Blocked culverts. <br /> • Blocked and loose down drains. <br /> • Eroded drainage berms and swales. <br /> • Other drainage facilities not working properly. <br /> t5.2.B.2 Maintenance <br /> According to the current WDR, SWD will inspect drainage ditches <br /> before October 1St each year. SWD will correct drainage <br /> problems, if discovered. <br /> 5.2.0 Site Security <br /> The property boundary of HLSL is fenced to maintain site security. <br /> SWD will visually inspect for any signs of damage to landfills <br /> perimeter fences and entrance drive gates. Damaged fences will be <br /> repaired. <br /> 6.0 REPORTING REQUIREMENTS <br /> SWD follows the reporting requirements as identified in HLSL's current Waste Discharge <br /> Requirements and Monitoring and Reporting Program No R5-2009-0049. <br /> 7.0 EMERGENCY RESPONSE PLAN <br /> HLSL's emergency response plan has been revised to comply with Title 27 section 21130 <br /> (Appendix A). <br /> t <br /> 8.0 POSTCLOSURE MAINTENANCE COST <br /> The estimated annual cost to maintain HLSL is approximately $ 133,000 (2009 dollars) <br /> (Table1). This amount includes postclosure corrective action. <br /> t <br /> Postclosure Maintenance Plan San Joaquin County <br /> Harney Lane Sanitary Landfill 8 Department of Public Works <br /> Revised July 30,1019 Solid Waste Division <br />