Laserfiche WebLink
TABLE 1 <br /> POSTCLOSURE MAINTENANCE COST <br /> HARNEY LANE SANITARY LANDFILL <br /> COST <br /> ITEM POSTCLOSURE MAINTENANCE ITEMS Per Year NOTE <br /> NO (2009 dollars) <br /> (NON CORRECTIVE ACTION) <br /> 1 LANDFILL GAS EMISSIONS AND MIGRATION <br /> Operation & Monitoring <br /> Quaterly Perimeter LFG Migration Monitoring $ 8,800 1 <br /> Monthly LFG Collection System Monitoring and Adjustment $ 18,300 1 <br /> LFG Surface Emission Tests $ 2,000 1 <br /> SJVAPCD permit fee $ 1,000 2 <br /> LFG System-Electrical Utilities (PG&E) $ 11,260 2 <br /> Maintenance <br /> Regular Scheduled LFG Collection System Maint $ 6,520 3 <br /> Emergency Repair of LFG Collection System $ 5,420 4 <br /> Subtotal: LFG Control $ 53,300 <br /> 2 CLOSURE COVER <br /> Monthly Site Inspection $ 9,840 7 <br /> - - <br /> Top Deck Grading Maintenance $ 12,000 8 <br /> Vegetation Maintenance $ 1,800 9 <br /> Vegetation Control $ 4,760 2, 10, 11 <br /> Erosion Control - $ 1,850 12 _ _.. <br /> Subtotal: Cover Maintenance $ 30,250 <br /> 3 DRAINAGE <br /> Drainage Ditch Cleaning $ 2,320 13 <br /> Down Drain Inlet/Culvert Cleaning $ 1,440 14 <br /> Subtotal: Drainage Maintenance $ 3,760 <br /> 4 MISC OVERHEAD <br /> Site Security- Fence Repair $ 500 <br /> Waste Discharge Requirement Renewal Fees (annual) $ 1,300 15 <br /> Subtotal: Misc Overheadi $ 1,800 <br /> SUBTOTAL: NON CORRECTIVE ACTION ITEMS $ 89 110 <br /> (CORRECTIVE ACTION ITEMS) <br /> 5 POSTCLOSURE CORRECTIVE ACTION MONITORING <br /> Groundwater and Surface Water Monitoring $ 32,000 5 <br /> - - - - - - - - <br /> Groundwater Well Replacement(one well every five_years) $ 3,620 6 <br /> VOC Monitoring Per revised WDR's $ 8,000 1 <br /> SUBTOTAL: CORRECTIVE ACTION MONITORING ITEMS $ 43,620 <br /> Postclosure Maintenance Total (Annual) 132,730 <br /> Postclosure Maintenance Total 0 Year $ 3,981,900 <br /> Postclosure Maintenance Cost San Joaquin County <br /> Harney Lane Sanitary Landfill,Revised 7-30-2009 Department of Public Works <br /> NA1 Harney Lane\PCMP Plan 2009\HL-Post Clo Maint Cost_Table 1.xis Solid Waste Division <br />