My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 3:50:56 AM
Creation date
7/3/2020 11:09:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2009
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 <br /> POSTCLOSURE MAINTENANCE COST <br /> HARNEY LANE SANITARY LANDFILL <br /> COST <br /> ITEM POSTCLOSURE MAINTENANCE ITEMS Per Year NOTE <br /> NO (2009 dollars) <br /> (NON CORRECTIVE ACTION) <br /> 1 LANDFILL GAS EMISSIONS AND MIGRATION <br /> Operation & Monitoring <br /> Quaterly Perimeter LFG Migration Monitoring $ 8,800 1 <br /> Monthly LFG Collection System Monitoring and Adjustment $ 18,300 1 <br /> LFG Surface Emission Tests $ 2,000 1 <br /> SJVAPCD permit fee $ 1,000 2 <br /> LFG System-Electrical Utilities (PG&E) $ 11,260 2 <br /> Maintenance <br /> Regular Scheduled LFG Collection System Maint $ 6,520 3 <br /> Emergency Repair of LFG Collection System $ 5,420 4 <br /> Subtotal: LFG Control $ 53,300 <br /> 2 CLOSURE COVER <br /> Monthly Site Inspection $ 9,840 7 <br /> - - <br /> Top Deck Grading Maintenance $ 12,000 8 <br /> Vegetation Maintenance $ 1,800 9 <br /> Vegetation Control $ 4,760 2, 10, 11 <br /> Erosion Control - $ 1,850 12 _ _.. <br /> Subtotal: Cover Maintenance $ 30,250 <br /> 3 DRAINAGE <br /> Drainage Ditch Cleaning $ 2,320 13 <br /> Down Drain Inlet/Culvert Cleaning $ 1,440 14 <br /> Subtotal: Drainage Maintenance $ 3,760 <br /> 4 MISC OVERHEAD <br /> Site Security- Fence Repair $ 500 <br /> Waste Discharge Requirement Renewal Fees (annual) $ 1,300 15 <br /> Subtotal: Misc Overheadi $ 1,800 <br /> SUBTOTAL: NON CORRECTIVE ACTION ITEMS $ 89 110 <br /> (CORRECTIVE ACTION ITEMS) <br /> 5 POSTCLOSURE CORRECTIVE ACTION MONITORING <br /> Groundwater and Surface Water Monitoring $ 32,000 5 <br /> - - - - - - - - <br /> Groundwater Well Replacement(one well every five_years) $ 3,620 6 <br /> VOC Monitoring Per revised WDR's $ 8,000 1 <br /> SUBTOTAL: CORRECTIVE ACTION MONITORING ITEMS $ 43,620 <br /> Postclosure Maintenance Total (Annual) 132,730 <br /> Postclosure Maintenance Total 0 Year $ 3,981,900 <br /> Postclosure Maintenance Cost San Joaquin County <br /> Harney Lane Sanitary Landfill,Revised 7-30-2009 Department of Public Works <br /> NA1 Harney Lane\PCMP Plan 2009\HL-Post Clo Maint Cost_Table 1.xis Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.