My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 3:50:56 AM
Creation date
7/3/2020 11:09:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2009
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 (CONTINUED) <br /> POSTCLOSURE MAINTENANCE COST <br /> HARNEY LANE SANITARY LANDFILL <br /> NOTES (CONTINUED): <br /> 9 Hydroseeding and fertilizer application of one acre $ 1,800 <br /> (Marks Hydroseeding) <br /> 10 Mowing vegetation on top deck (LS) $ 2,600 <br /> (per Barajas Tree Service) <br /> 11 Vegetation control near LFG headers and vegetation removal in drainage ditch. <br /> (2 laborers for 3 days @ $45/hr) $ 2,160 <br /> 12 Annual erosion control on slopes with poor vegetation <br /> Area =6,000 SF <br /> Erosion control mat(5 mats @ �50 ea) $ 250 <br /> Installation cost(2 days x 2 laborers @ $45/hr) $ 1,600 <br /> Total $ 1,850 <br /> 13 Silt removal and fill of low spots in drainage ditch cost estimate per year. <br /> Dump truck/backhoe with operator <br /> $1,600/day for two days (Westcoast Backhoe Inc) $ 2,320 <br /> 14 Culvert and down drain inlet cleaning cost estimate per year <br /> 2 laborers @ $45/hr= $360/day for 2 days $ 1,440 <br /> 15 HLSL's waste discharge requirements (WDR)fees divided per year <br /> HLSL's WDR has been renewed approximately every 10 yrs <br /> Latest revision of HLSL's WDR in 2009 $ 13,000 <br /> Prorated cost per year $ 1,300 <br /> Postclosure Maintenance Cost San Joaquin County <br /> Harney Lane Sanitary Landfill,Revised 7-30-2009 Department of Public Works <br /> N:\1 Harney Lane\PCMP Plan 2009\HL-Post Clo Maint Cost_Table 1.xls Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.