Laserfiche WebLink
LOG OF EXPLORATORY BORING <br /> PROJECT NUMBER 939-01.09 BORING NO. GW-8 <br /> PROJECT NAME Harney Lane Landfill PAGE 3 OF 3 <br /> BY L. Gallagher DATE 10/8/91 SURFACE ELEV. ft. <br /> w LITHO- VEL <br /> Qom.. GRAPHIC DESCRIPTION DETA <br /> I �J � Q COLUMN <br /> S (SW), continued. <br /> I <br /> BORING TERMINATED AT 44 FEET. <br /> 45 <br /> 1 <br /> I50 <br /> 1 <br /> I55 <br /> 60 <br /> 1 <br /> I <br /> x �iwxxs <br /> ly <br /> Boring drilled with 6-inch-diameter solid flight augers. Boring converted to a 0.5-inch-ID PVC Tri-level Gas <br /> Probe. Logged from drill cuttings. <br /> I EM ON <br /> T <br /> 1 <br />