Laserfiche WebLink
Shaw Environmenta <br /> GROUNDWATER SAMPLING AND YS QUES RM <br /> PROJECT NAME: Harney Lane Landfill tt <br /> t " <br /> SCHEDULED DATE: January 2013 <br /> SPECIAL INSTRUCTIONS/CONSIDERATIONS: \� Project gr: JC lsham <br /> .Semi-Annual 2013 Groundwater Montoring(1st&3r Qtrs tY Sacto Dir 916-5654316 <br /> 1st Qtr 2013 Ground Water Wells. Concord ir: 925-288-2381 <br /> P ject No.: 139866.1st Q 2013 <br /> Wells equipped with dedicated Well Wizard purge&bladde amps. Sampler: Paul Weinhardt <br /> MW-4 dries,purge 1 st. Cell: 530-391-4037 <br /> g <br /> Take well wizzard control box or logic unit. <br /> Air compressor will work to purge wells. Well Lock <br /> Number(s) <br /> Notify Mike Carroll prior to monitoring event. 0464 <br /> Phone(209)468-8504 Or via E-mail<mcarroll@sjgov.org> <br /> Weli Number Casing Casing Depth to <br /> or Source Diameter Length Water ANALYSES REQUESTED <br /> (inches) (feet) (feet) <br /> 10/9/2012 DTWs on all wells. <br /> MW-1 4.5 150.0 138.52 <br /> VOCs by 8260B <br /> MW-2 4.5 143.0 133.59 TDS,Chloride,Total Alkalinity <br /> Total Hardness,COD <br /> MW-3 4.5 137.0 133.19 <br /> (Neve pump installed @ 136.5' Feb/2010) ADD 1St Qtr Annual: Bicarbonate, <br /> Nitrate-Nitrogen(48-hr HOLD),Sulfate <br /> MW-4 4.5 135.8 132.38 Ca,Mg,&Na(field filtered) <br /> *MW-5 2.0 145.4 130.56 <br /> Field Measurements: <br /> *NfW-6 2.0 150.1 13392 pH,Temp,Turbidity,DO,ORP(Redox),EC <br /> *2"Grundfos Redi-flo pump is installed 10 ft below <br /> the last measured GW level in both the new wells <br /> RECORD TIME DTW MEASUREMENTS ARE <br /> MEASURED. RECORD RECHARGE RATE. <br /> (Drawdown/Flow rate) <br /> Field Blank = Mw-7- EPA 8260B <br /> Trip Blank <br /> Laboratory and Lab QC Instructions: <br /> BC Labs-Tina Green Please report L's,PQL's,&Trace. <br /> 4100 Atlas Cou t BC Lab Courier: <br /> Bakersfield,Ca 93308 Ross Dickey @ 661-201-4171 <br /> 661-327-4911/Fx:327-1918 <br /> UPS Acct 965376 <br /> Harney 1st,3rd Qtrs 1 of 2 <br />