Laserfiche WebLink
GROUNDWATER SAMPLING" <br /> AND ANALYSIS REQUEST $M <br /> PROJECT NAME: Harney La Land ® I! <br /> r <br /> SCHEDULED DATE: Marc ,2013 <br /> P t Mngr: JC Ish4m <br /> SPECIAL INSTRUCTIONS./CONSIDERATIONS S. _ SAL it Ph:_ 916-5W5-43.16 <br /> Resample-for-VO-Cs-only- dDir:_-9254_ <br /> Ground Water Wells. f Project No.: I3!$66.1st Q 2013 <br /> le VOCs <br /> Wells equipped with dedicated Well Wizard purge bladder pumps. Sampler: aul Weinhardt <br /> MW-4 dries,purge 1st. Ce : 530-391-4037 <br /> Take well wizzard control box or logic unit. <br /> Air compressor will work to purge wells. Well Lock <br /> Notify Mike Carroll prior to monitoring event. Number(s) <br /> Phone(209)468-8504 Or via E-mail<mcarroll@sjgov. rg> 0464 <br /> Well Number Casing Casing Depth to <br /> or Source Diameter Length Water ANALYSES REQUESTED <br /> (inches) (feet) (feet) <br /> 2/1/2013 Resample for VOCs only. <br /> MW-1 4.5 150.0 138.53 Benzene,Toulene <br /> MW-2 4.5 143.0 133.97 Benzene,Toluene,Tetrachloroethene <br /> MW-3 4.5 137.0 131.74 Dichlorodifluoromethane <br /> (New pump installed @ 136.5 Feb/2010) <br /> MW-4 4.5 135.8 131.63 Benzene,Ethylbenzene,Toluene,Total Xylenes <br /> *MW-5 2.0 145.4 129.85 Dichlorofluoromethane,Tetrachloroethene <br /> * 6 2-8 X94 i33.98 <br /> Field Measurements: <br /> *2"Grundfos Redi-flo pump is installed 10 ft below pH,Temp,Turbidity,DO,ORP(Redox),EC <br /> the last measured GW level in both the new wells <br /> RECORD TIME DTW MEASUREMENTS ARE <br /> MEASURED. RECORDRECHARGE RATE. <br /> (Drawdown/Flow rate) <br /> Field Blank EPA 8260B <br /> Trip Blank <br /> Laboratory and Lab QC Instructions <br /> BC Labs-Tina Green Please report MDL's,PQL's,&Trace. <br /> 4100 Atlas Court BC Lab Courier. <br /> Bakersfield,Ca 93308 Ross Dickey @ 661-201-4171 <br /> 661-3274911/Fx:327-1918 <br /> UPS Acct 965376 <br /> Resample Mar 2013 1 of 1 <br />