Laserfiche WebLink
CB&I <br /> GROUNDWATER SAMPLING AND ANALYSIS REQUEST FORM <br /> PROJECT NAME: Harney Lane La <br /> San Joaquin un ` <br /> SCHEDULED DATE: April 2013.''+ <br /> SPECIAL INSTRUCTIONS/CONSIDERATIONS/f` oject Mngt: JC Isham <br /> Ground Water Levels only 2nd&4th Quarters. !� '` �' o Dir Ph: t 916-5654316 <br /> 1st Semester(2nd Quarter 2013) cord Dir:f`s 925-288-2381 <br /> r \ ` Project 14o.: 4398'66 f yg213 <br /> ` Coordiykor. Sheila Richgels <br /> S46pler. Paul Weinhardt <br /> Cell: 530-3914037 <br /> We Lock <br /> ll <br /> Number(s) <br /> Notify Mike Carroll prior to monitoring event. 0464 <br /> Phone(209)468-8504 Or via E-mail<mcarroll@s ov.org> <br /> Well Number Casing Casing Depth to <br /> or Source Diameter Length Water ANALYSES REQUESTED <br /> (inches) (feet) (feet) <br /> 2/1/2013 DTWs on all wells. <br /> MW-1 4.5 150.0 138.53 DTW measurements for all wells. <br /> MW-2 4.5 143.0 133.97 <br /> MW-3 4.5 137.0 131.74 <br /> (Old TD 1442;QED pumps stuck at bottom of well 8/26/09) <br /> (New pump installed,set at 136.50 Feb 2010) <br /> MW-4 4.5 135.8 131.63 <br /> MW-5 2.0 145.4 129.85 <br /> MW-6 3.0 150.1 133.98 <br /> Laboratory and Lab QC Instructions <br /> Harney 2nd,4th Qtrs 1 of 2 <br />