Laserfiche WebLink
nonstatistical COCs, includingVOCs, other organic COCs, and dissolved metals not detected in <br /> 9 <br /> background, shall be equal to the method detection limit (MDL). Concentration limits are updated <br /> semiannually, where possible, and were most recently updated in this semester (Table 1). <br /> Interim CLs <br /> Fourteen out of 25 dissolved metals were identified as statistical COCs, based on <br /> available historical monitoring data from upgradient well MW-1. Interim statistical CLs for <br /> these constituents have been estimated. Concentrations of the remaining 11 dissolved <br /> metals were assumed nonstatistical COCs for setting interim CLs. <br /> Revised CLs <br /> Revised CLs shall be developed for general minerals and dissolved metals once <br /> additional background monitoring wells have been established per WDR and a sufficient <br /> amount of monitoring data have been collected for statistical determination of CLs <br /> A Mann-Kendall trend analysis of all monitoring parameters for MW-2 is conducted semiannually <br /> in accordance with WDR Order No. R5-2009-0049. The results of a statistical analysis of trends <br /> in VOC concentrations in well MW-2 are shown on Tables 1 and 2. <br /> Surface Water <br /> Concentration limits for surface water constituents are determined by the inter-well tolerance limit <br /> method using Sanitas software. Analytical results from the upstream monitoring point S-1 provide <br /> the background data for this analysis. Compliance is verified if current test result from monitoring <br /> point S-2 (downstream) is within the tolerance limit. Tolerance limits are updated when surface <br /> water analyses are available. <br /> Note that surface water samples are no longer being collected because the landfill is separated <br /> from Waters of the State by drainage system and a retention pond. Samples will be taken from <br /> pond discharge if it were to occur. Pond discharge requires manual operation of discharge <br /> pumps. <br /> MONITORING RESULTS <br /> Groundwater <br /> Summary <br /> The groundwater at all monitoring wells meet drinking water standards. <br /> The second semester sampling event was conducted on August 2 and August 21, 2013. <br /> Quarterly groundwater elevations were measured at all groundwater monitoring wells on <br /> August 2, 2013 and October 11, 2013. <br /> In the second semester 2013, volatile compounds associated with landfill gas were detected at <br /> well MW-2, well MW-4A and well MW-5. All concentrations were below 1.0 ppb. Note that MW-5 <br /> is upgradient from the landfill, but downgradient from the wastewater treatment ponds. <br /> Harney Lane Sanitary Landfill 5 Department of Public Works/Solid Waste <br /> 2ne Semester and Annual 2013 Groundwater Monitoring Report County of San Joaquin—January 31,2014 <br />