Laserfiche WebLink
I V. Surface Conditi IV <br /> A. Is site access adequately restricted? (9/N) <br /> B. Is the waste adequately covered to prevent human contact? <br /> C Is the final drainage system for the site adequate to prevent erosion? <br /> &N) <br /> D. Is the finalgrading adequate to promote run-off? (Y/N) ("/Y (004", <br /> E. Are slopes greater than 3:1 (33% or 18 degrees)?ON) <br /> F. Are slopes greater than 1.75:1 (57% or 30 degrees)? <br /> V. Postclosure Land Use <br /> h, <br /> A. Has the land use of the site significantly changed since closure? <br /> �Y& <br /> If yes, include or reference site improvement plans and answer the following: <br /> 1. Give the date that the improvements were constructed <br /> 2. Have the improvements compromised the integrity of the final <br /> cover? (Y/N/NA) <br /> 3. Has differential settlement affected the improvements? (Y/N) <br /> B. Is there a proposed change in postclosure land use that may jeopardize <br /> the integrity of previously closed sites or pose a potential threat to public <br /> health and safety or the environment? (Y/N) <br /> If yes, briefly describe the proposed project: <br /> C. Is there a postclosure land use tracking system? (Y/N) <br /> If yes, describe tracking system: <br /> V1. Disposal Site Priority (See Prioritizatior, Chart) <br /> A1: A2:—A 3: B1: B2:—B 3: C1: C2:—C 3:_ D <br /> Vill. Comments <br /> PREPARED BY. DATE: <br /> COMPLIANCE BRANCH REVtW: <br /> CIWMB CLOSURE AND REMEDIATION BRANCH APPROVAL: <br /> Page 4 of 4 <br /> ClWMB Closure and Remediation Branch (1/25193) <br />