My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3242
>
4400 - Solid Waste Program
>
PR0440068
>
COMPLIANCE INFO_1993-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2021 2:45:06 PM
Creation date
7/3/2020 11:10:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993-2007
RECORD_ID
PR0440068
PE
4434
FACILITY_ID
FA0001871
FACILITY_NAME
CALIFORNIA CLAY LANDFILL
STREET_NUMBER
3242
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17702029
CURRENT_STATUS
02
SITE_LOCATION
3242 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440068_3242 S EL DORADO_1993-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT B B-2 <br />MONITORING WELL WORKPLAN AND <br />MONITORING WELL INSTALLATION REPORT GUIDANCE <br />E. Well Survey: <br />Identify the Licensed Land Surveyor or Civil Engineer that will perforin the survey <br />Describe what well features will be surveyed (i.e. top of casing, horizontal and vertical <br />coordinates, etc.) <br />Vertical accuracy shall be to at least 0.01 foot <br />F. Well Sampling: <br />Minimum time after development before sampling (48 hours) <br />Well purging method and amount of purge water <br />Sample containers, collection method, and preservation method <br />Table describing sample volumes, sample containers, preservation agents, and hold times <br />QA/QC procedures <br />G. Water Level Measurement: <br />The elevation reference point at each monitoring well shall be within 0.01 foot. Ground <br />surface elevation at each monitoring well shall be within 0.01 foot. <br />Method and time of water level measurement shall be specified. <br />H. Proposed time schedule for work. <br />SECTION 2 — Groundwater Sampling and Analysis Plan <br />A.. General Information: <br />Site Location <br />Monitoring well locations <br />Monitoring well construction details including elevation, well depth, casing material and size, <br />and screen interval <br />Equipment decontamination procedures <br />Health and safety plan <br />Topographic map showing any existing wells, proposed wells, waste handling facilities, <br />utilities, and other major physical and man-made features. <br />B. Water Level Measurement: <br />Ground surface elevation at each monitoring well shall be within 0.01 foot. <br />Method and time of water level measurement shall be specified <br />Water level in well shall be allowed to equilibrate prior to measuring the depth to water <br />C. Well Sampling: <br />Well purging method and amount of purge water, purge water storage <br />Sample containers, collection method, and preservation method <br />Table describing sample volumes, sample containers, preservation agents, and hold times <br />Identification of analytical laboratory <br />Chain of custody procedures <br />QA/QC procedures <br />D. Proposed time schedule for work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.