My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3242
>
4400 - Solid Waste Program
>
PR0440068
>
COMPLIANCE INFO_1993-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2021 2:45:06 PM
Creation date
7/3/2020 11:10:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993-2007
RECORD_ID
PR0440068
PE
4434
FACILITY_ID
FA0001871
FACILITY_NAME
CALIFORNIA CLAY LANDFILL
STREET_NUMBER
3242
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17702029
CURRENT_STATUS
02
SITE_LOCATION
3242 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440068_3242 S EL DORADO_1993-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLEINFELDER <br /> Methane gas monitoring is proposed in the Closure Plan (see Section II1.2.4, Landfill Gas <br /> Monitoring). The monitoring program has two phases. Phase 1 involves installation of <br /> temporary gas probes. If significant amounts (greater than 5%) of methane are detected in these <br /> temporary probes, then Phase 2 monitoring will be implemented. Phase 2 will involve <br /> installation of four permanent gas wells with two probes per well. One probe will be screened to <br /> monitor the shallow zone (5 to 10 feet below the surface) and the second will be screened to <br /> monitor the zone immediately above seasonally low groundwater. <br /> Cove Contractors has no plans to develop the site in the foreseeable future. It is possible <br /> thought, that Cove Contractors may elect to build either a warehouse or office building on the <br /> site at some point in the distant future. Since this would be a change in postclosure use, Cove <br /> Contractors will contact the appropriate regulatory agencies to obtain the necessary permits for <br /> such a change in postclosure use. Landfill gas monitoring will be one element of this permitting <br /> effort. <br /> 4. How and when will on-site buildings be repaired and maintained? They are currently in <br /> a state of disrepair. <br /> The on site building is unoccupied although Cove Contractors may use if for some purpose in the <br /> future. The current state of the building is caused by vandalism. As part of closure activities, <br /> Cove Contractors will secure the building (repair exterior walls and doors) and inspect the <br /> condition of the building as part of postclosure maintenance. <br /> 5. Any and all pertinent agency requirements must be met (i.e., RWQCB, APCD, etc.)prior <br /> to CPCMP approval. <br /> Comment noted. <br /> 23-481399-A00/TL960001 Page 5 of 5 January 4, 1996 <br /> Copyright 1996 Kleinfelder,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.