Laserfiche WebLink
• • <br /> 7;9 1N/LEER�'ROO/�[Si <br /> SITE HEALTH AND SAFETY PLAN <br /> • The Site Safety Officer (SSO) must review the Site Health and Safety Plan (SHSP)with all members of the field crew, <br /> including Miller Brooks employees and subcontractors,prior to beginning all fieldwork. <br /> • All Miller Brooks field team members working in the exclusion zone, or who may be exposed during the course of their <br /> work, shall have completed OSHA 40-hour HAZWOPER and annual refresher training (29 CFR 1910.120), CPR and <br /> First Aid training. Documentation of training shall be readily available. <br /> • Each Miller Brooks team member must review, sign and date the SHSP and the Acknowledgement Agreement in <br /> Appendix D. <br /> • Each subcontractor employee and visitor must review the SHSP and sign, date, and describe their affiliation in Appendix <br /> D. <br /> • Signed SHSP is kept in the field for duration of project and returned to the project file upon completion of field activities. <br /> • SHSP shall be revised or rewritten if site activities are changed significantly, if areas of differing hazard are involved, or <br /> as information about contaminants and hazards changes. Changing conditions may justify either increasing or <br /> decreasing SHSP restrictions and action levels,depending upon the additional information generated. <br /> I. GENERAL INFORMATION <br /> Miller Brooks Project# 01-707-0001-01 <br /> Cove Contractors— <br /> Client: Andrew Keller Site Owner: Learner Company <br /> Site Name: Cove Contractors Client Claim/PO Number: NA <br /> Site Address: 3242 South EI Dorado St,Stockton California,92506 <br /> Site Manager: Tim Eyres <br /> Site Manager Signature: Date: <br /> Client Manager: Jeff Bennett <br /> Client Manager Signature Date: <br /> Revised by: Date: <br /> Revision Approved by: Date: <br /> Place dates in appropriate box es for current phase(s)of site activities. <br /> Site Monitoring Monitoring Gas Probe Monitoring Landfill Gas Surface <br /> Activities Well Well Installation Well Monitoring Water <br /> Survey Installation Sampling Sampling <br /> Landfill As needed 4/07 9/07 Quarterly Quarterly Semi- <br /> Closure annually <br /> Activities <br /> Miller Brooks Environmental Inc. January 23, 2008 Page 1 of 15 <br />