1.0 HASP SUMMARY INFORMATION <br /> This project is anticipated be completed in two phases: (1)Installation of extraction wells and (2) <br /> Installation of dewatering system. This HASP will be updated or amended, as necessary, to <br /> reflect any changes that may be encountered. Personnel responsibilities are described in Table 1 <br /> and personnel training requirements are provided in Table 2. <br /> Project Name.................................. Installation of Extraction Wells&Dewatering System <br /> Project Location............................... Cove Contractors <br /> 3242 South El Dorado Street <br /> Stockton, CA <br /> Project Number............................... 04.20090407.00 <br /> Project Manager.............................. Jeff Bennett 714-500-5400 ext. 5454 <br /> Start Date/End Date TBD <br /> Site Safety Officer(s)......................... Tim Eyres <br /> Client Contact <br /> SiteSupervisor................................. NA <br /> Corporate Safety&Health Manager..... Doris Boyd 901-359-1996(cell) <br /> Planned Activities............................. Installation of Extraction Wells and Installation of <br /> Dewatering System <br /> Chemical Hazards............................ Groundwater: gasoline, diesel, barium, iron, <br /> manganese,chlorobenzene, 1,2-dichlorobenzene, 1,4- <br /> dichlorobenzene, 1.2-dichloroethane, TBA, and MTBE <br /> Vadose zone: methane <br /> Initial PPE...................................... Level D <br /> EmergencyPhone............................. 911 <br /> Hospital Information........................ 209-468-6300 <br /> San Joaquin General Hospital <br /> 500 West Hospital Road, French Camp, California <br /> (See Figure 3) <br /> 6 <br />