Laserfiche WebLink
MONITORING ANDPO G PROGRAM -2- <br /> CRO R LANDSCAPE SE ES <br /> MANTECA COMPOSTING FACILITY ` <br /> SAN JOAQUIN COUNTY <br /> Report in Frequency of <br /> Par eter Units of Reporting <br /> Green waste received on-site tons Quarterly <br /> Type of material received --- Quarterly <br /> Source(s) of material received — Quarterly <br /> Results of Load Checking Program Quarterly <br /> Capacity of composting unit percent Quarterly <br /> remaining <br /> Compost shipped off-site Tons Quarterly <br /> SURFACE IMPOUNDMENT MONITORING x <br /> r <br /> Water in the surface impoundments generated as a result of dust control, precipitation, and compost <br /> pile water runoff shall be sampled and analyzed for the parameters specified in Table 1. <br /> The freeboard in the surface impoundments shall be measured monthly to the nearest one-tenth of a <br /> foot. Permanent markers shall be placed in each surface impoundment with ' ibrations indicating the <br /> water level at design capacity and available operational freeboard. This information shall be reported <br /> annually. <br /> TABLE 1 - SURFACE IMPOUNDMENT MONITORING PROGRAM <br /> Parameter Units Fre crenc <br /> Specific Conductance p os/cm Monthly <br /> pH number Monthly <br /> Minimum freeboard feet&tenths monthly <br /> Total Dissolved Solids mg/l Quarterly <br /> Chloride mg/l Quarterly <br /> Sulfate mg/l Quarterly <br /> Nitrate- Nitrogen mg/l Quarterly <br />