My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LIBERTY
>
17200
>
4400 - Solid Waste Program
>
PR0516589
>
COMPLIANCE INFO_2000-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2021 10:01:48 AM
Creation date
7/3/2020 11:11:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2017
RECORD_ID
PR0516589
PE
4443
FACILITY_ID
FA0012694
FACILITY_NAME
NILSEN FARMS
STREET_NUMBER
17200
Direction
E
STREET_NAME
LIBERTY
STREET_TYPE
RD
City
GALT
Zip
95632
CURRENT_STATUS
02
SITE_LOCATION
17200 E LIBERTY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4443_PR0516589_17200 E LIBERTY_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CalRecycle <br /> Compostable Materials Handling Operation and Facility Inspection Report (93) <br /> jai rcein'� geacy County of San Joaquin <br /> 3, <br /> 16, <br /> �➢ ��" L cor -^,�t xar Tin Vx�:er' <br /> �S°FSG II F tB U ber 99- 99'9 IT! <br /> 16 ` Pro9ca ` <br /> 39-AA-0043 9/7/2012 LEA Periodic <br /> ittln ' <br /> 1:45 pm Tlmt?ut 2:10 pm Inspectionire <br /> eCelit By ;t <br /> Nilsen Farms Nilsen, Norm-Nilsen Farms <br /> 17200 Liberty Road Galt, CA 95632,Acampo Norm Nilsen <br /> 95632 <br /> Benjamin Escotto <br /> THE ABOVE FACILITY WAS INSPECTED FOR COMPLIANCE WITH APPLICABLE SECTIONS OF THE DIVISION 300E THE PUBLIC RESOURCES CODE(PRC)AND TITLE 14 AND TITLE 27 CALIFORNIA CODE OF REGULATIONS(CCR) <br /> Y <br /> t <br /> X „RBO <br /> v�� <br /> Routine quaterly inspection conducted on this date and the following Iwas noted: <br /> 1. There was no active composting at the time of the inspection. <br /> 2. A call was received on 8/14/12 from the owner, Norm Nilsen, stating that the manure and litter from the turkey <br /> houses was removed and placed in the same area as in previous years (on site field adjacent to the turkey <br /> houses). Mr. Nilsen also said that the manure would be removed soon and trucked to an organic tomato farmer <br /> for fertilizer. <br /> 3. No manure was observed on site. According to Manuel, rancher on site,the manure was already removed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.