My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LIBERTY
>
17200
>
4400 - Solid Waste Program
>
PR0516589
>
COMPLIANCE INFO_2000-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2021 10:01:48 AM
Creation date
7/3/2020 11:11:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2017
RECORD_ID
PR0516589
PE
4443
FACILITY_ID
FA0012694
FACILITY_NAME
NILSEN FARMS
STREET_NUMBER
17200
Direction
E
STREET_NAME
LIBERTY
STREET_TYPE
RD
City
GALT
Zip
95632
CURRENT_STATUS
02
SITE_LOCATION
17200 E LIBERTY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4443_PR0516589_17200 E LIBERTY_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br /> CalRecycle <br /> Compostable Materials Handling Operation and Facility Inspection Report (93) <br /> En orcement,_ ¢ {� County of San Joaquin <br /> SSS Fac�tity Fite Number J999jinspection mate ;` oiratiad <br /> 39-AA-0043 6/15/2012 LEA Periodic <br /> Time In 11:40 am Teme 0u# 12:10 pm Inspection T�rne <br /> Nilsen Farms Nilsen, Norm-Nilsen Farms <br /> Fa �hr�lcscatianhAtt Name NOW, <br /> , ,v,� <br /> 17200 Liberty Road Galt, CA 95632,Acampo Norm Nilsen <br /> 95632 <br /> r <br /> Benjamin Escotto <br /> THE ABOVE FACILITY WAS INSPECTED FOR COMPLIANCE WITH APPLICABLE SECTIONS OF THE DIVISION 30 OF THE PUBLIC RESOURCES CODE(PRC)AND TITLE 14 AND TITLE 27 CALIFORNIA CODE OF REGULATIONS(CCR) <br /> X No vloiat�ons ar Areas o <br /> x <br /> Y� <br /> P . <br /> Routine quaterly inspection conducted on this date and the following was noted: <br /> 1. There was no active composting at the time of the inspection. <br /> 2. The manure and litter are still in the turkey houses. <br /> 3. According to the rancher on site,the manure will be removed sometime after July of this year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.