Laserfiche WebLink
Inspection F2pont Cciinmonts <br /> Notes: <br /> 1.) Facility incoming and outgoing sheetrock records were inspected for tonnage counts. Tonnage is kept less than 25 <br /> tons per day in compliance with EA notification requirements. Facility tonnage through June 16, 2015 show 148.77 tons <br /> of sheetrock was received for an average of 27.05 tons per month. <br /> 2.) Five loads of sheetrock totaling 129.64 tons were removed by Weever Trucking on the following dates: 5/15/2015 <br /> (2x), 5/20/2015, 5/22/2015, 5/23/2015. <br /> 3.)According to facility records, there are 85 tons of sheetrock currently onsite. Sheetrock is stored in two piles. One <br /> pile is located on the southwest side of the facility and the other pile is located on the northwest side. <br />