My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1991_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
1333
>
4400 - Solid Waste Program
>
PR0440009
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1991_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 2:59:17 AM
Creation date
7/3/2020 11:12:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1991_1
RECORD_ID
PR0440009
PE
4445
FACILITY_ID
FA0000428
FACILITY_NAME
CENTRAL VALLEY WASTE SERVICES
STREET_NUMBER
1333
Direction
E
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
APN
SEE COMMENTS
CURRENT_STATUS
01
SITE_LOCATION
1333 E TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0440009_1333 E TURNER_1991_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2000 AD TRAFFIC ON SELECTED STREETS NORTHEAST INDUSTRIAL AREA <br /> STREET SEGMENT GROWTH FACTOR ADT ESTIMATE <br /> Beckman North of <br /> Lockeford St. 4 .5% ** 3 ,000 <br /> Beckman South of <br /> Turner Road 4 . 5% ** 9,000 <br /> Turner West of <br /> Beckman 4 . 5% 14 ,000 <br /> Turner West of <br /> Cherokee 4. 5% 16 ,000 <br /> Lockeford West of <br /> Beckman 4 . 5% 5 ,000 <br /> Highway 12 West of <br /> Highway 99 11% 14 ,000 <br /> Highway 12 East of <br /> Interchange Linear Projection* 20,000 <br /> Highway 12 East of Linear Projection <br /> Cluff Plus Industrial ** 18 ,000 <br /> Highway 12 East of Linear Projection <br /> Guild Plus Industrial ** 17 ,000 <br /> Highway 99 South Linear Projection <br /> of Lodi Plus Industrial ** 38 ,000 <br /> Highway 99 North Linear Projection <br /> of Lodi Plus Industrial ** 45 ,000 <br /> * See Appendix for derivation <br /> ** Linear Projection plus Industrial traffic projections X 75% to <br /> approximate buildout Northeast Industrial Area <br />
The URL can be used to link to this page
Your browser does not support the video tag.