My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1991_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
1333
>
4400 - Solid Waste Program
>
PR0440009
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1991_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 2:59:17 AM
Creation date
7/3/2020 11:12:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1991_1
RECORD_ID
PR0440009
PE
4445
FACILITY_ID
FA0000428
FACILITY_NAME
CENTRAL VALLEY WASTE SERVICES
STREET_NUMBER
1333
Direction
E
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
APN
SEE COMMENTS
CURRENT_STATUS
01
SITE_LOCATION
1333 E TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0440009_1333 E TURNER_1991_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EBAJOB NO. DATE <br /> WASTECHNOLOGIES <br /> PROJECT <br /> TABLE - 1 <br /> NOISE OF TRANSFER STATION OPERATIONS <br /> Operation and <br /> Noise <br /> Levels Leo <br /> Equipment Location Field Nin. Max Leo a 200' Mrs/Da <br /> Loader (Case w-14) Outside, West Hard 60 70 66.5 4-8 <br /> Pushing Scrap of Tipping Floor <br /> Wood Into Piles. Bldg. 280-300' 69.7 <br /> From Measurement <br /> site. <br /> Loader (Case W-14) Passing By At 80' Hard 65 70 68.2 4 <br /> Spreading Peach Spreading a 260' <br /> Pita For Drying. 68.5 <br /> Transfer Station: In Front of Open Hard 58 75 66.6 8 <br /> Packer Trucks Dump- End of Transfer Bldg <br /> ing, a Loader (John 180' From Loading 67,4 <br /> Deers 644B) Pushing 350' From Farthest <br /> Waste. Temporary Operation <br /> (Stock piles) In <br /> Front of Reflective <br /> Surface. <br /> Packer Truck 50' Away Hard 70 78 73.5 1 <br /> Entering Transfer <br /> Station. 61.5 <br /> Packer Truck In Front of Hard 70 74 71.5 8 <br /> Unloading Inside Reflective Surface <br /> Building. 0 180' 70.6 - <br /> Packer Truck In Open Hard 60 60 60 <br /> Idling a 60' <br /> 49.6 <br /> Recycler (Blower) Adj. to Bldg. Hard 66 74 70.9 1 <br /> (Reflective Surfaces) <br /> 100' Away. 64.9 <br /> Truck washing <br /> With Truck Idling In Open Hard 62 64 63.1 g <br /> 170' Away <br /> 61.7 <br /> Shop: Pounding 170' Away In Front Hard 65 68 66.8 8 <br /> Oen Metal of Open Bays. 67 <br /> 200' 65.4 <br /> Shop: Trucks 130' Away In Front Hard 60 62 61.1 g <br /> JIdling of Open Doors R 200' <br /> 74. <br /> Recycle Area Cat In Open Soft 72 76 7t.55 <br /> 8 <br /> Handling Dirt, 200' Away <br /> Wood a Concrete 74,5 <br /> etc. <br /> Shaker Screen With In Open Soft 68 72 70.5 8 <br /> Jaw Type Cat Loader 130' Away <br /> 66.8 <br /> Shaker Screen In Open Soft 64 66 65.1 8 <br /> (Atone) 130' Away <br /> 61.4 <br /> Grape Punnice In Open Hard 60 65 63.2 8 <br /> Trucks (Small) a 100' <br /> 55.2 <br /> Transfer Truck In Open Hard 70 78 75.6 1 <br /> Pulling Out of a 100' <br /> Loading Chute 69.6 <br /> + 12X Grade <br /> Scarab Aerator In Open Hard 70 80 74 1 <br /> a 50' <br /> 65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.