My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
1333
>
4400 - Solid Waste Program
>
PR0440009
>
COMPLIANCE INFO_2001-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2025 2:21:28 PM
Creation date
7/3/2020 11:13:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2006
RECORD_ID
PR0440009
PE
4445 - TRANSFER STATION - MONTHLY INSPECTION
FACILITY_ID
FA0000428
FACILITY_NAME
CENTRAL VALLEY WASTE SERVICES
STREET_NUMBER
1333
Direction
E
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
APN
MULTIPLE APNS - SEE COMM
CURRENT_STATUS
Active, billable
SITE_LOCATION
1333 E TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0440009_1333 E TURNER_2001-2006.tif
Site Address
1333 E TURNER RD LODI 95240
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA California Integrated Waste <br />CIWMB 03 (Rev. 4/04) Management Board <br />INSPECTION REPORT ADDENDUM PAGE 2 OF 2 <br />AGENCY CONDUCTING INSPECTION: San Joaquin County Environmental Health Department <br />SITE NUMBER: 39 -AA -0017 <br />INSPECTOR: Frank Girardi <br />SITE NAME: Central Valley Waste Services <br />RECEIVED BY <br />INSPECTION DATE: 07/18/06 OPERATOR <br />COMMENTS: <br />1. AC T14 CCR 17408.6 - Maintenance - Area in front of transfer station building has worn and cracked asphalt and <br />potholes. The EHD has not received any repair time schedule regarding permanent repair of asphalt. <br />a. Per conversation with operator on July 11, 2006 an estimate for a temporary "6 -month life" asphalt repair patch has <br />been obtained from a general contractor and is under review for approval. Permanent repairs are proposed to be <br />done May 2007. <br />b. Submit repair time schedule in writing for temporary and permanent repair of asphalt. Description shall include any <br />changes of the operation with a site plan to include location of tipping area & traffic patterns. Repairs (temporary or <br />permanent) shall be completed prior to end of this summer. Any temporary/interim repair must maintain good <br />condition until such time a permanent repair is made (proposed in May 2007). <br />c. This AC will be upgraded to a Violation if this AC is not corrected by next month's inspection. <br />2. AC T14 CCR 18221.6 — TPR - U -waste screening program is currently in place. New signage posted at front scale <br />house regarding U -waste. Updated information for current U -waste screening operation has not been submitted to <br />the EHD. <br />a. Submit updated information in writing regarding u -waste screening operation currently in place. <br />b. This AC will be upgraded to a Violation if this AC is not corrected by next month's inspection. <br />3. Notes: <br />A. Transfer station building/public tipping area: Cement barrier/partition for public tipping area has been repositioned <br />approximately 30 feet away from building (toward the east). Previous tipping area (now behind partition) was <br />completely clear of debris. Operator indicated that the asphalt in this area is being evaluated for repair and that this <br />arrangement was temporary. Loader was pushing waste into the transfer station through the front of the building <br />(instead of the north opening). <br />a. Observed dusts being generated by loader at front of transfer station building. Take adequate measures to <br />control dust. <br />b. Implement controls regarding traffic safety (ie: signage to make drivers aware of cross traffic and <br />equipment). <br />B. Low waste pile volumes were observed at time of inspection. <br />C. Small amount of off site litter observed at northeast corner gate has been removed (previous AC cleared). <br />D. A meeting was held with Central Valley Waste Services on April 4, 2006 regarding proposed permanent u -waste <br />dismantling operation on-site. It is understood that a draft description of this operation will be submitted to the EHD <br />for review (prior to submitting a formal RFI amendment application package). This proposal shall be evaluated for <br />a significant change determination. <br />INSPECTOR SIGNATURE: / DATE: <br />
The URL can be used to link to this page
Your browser does not support the video tag.