Laserfiche WebLink
TABLE 1-1 <br /> SUMMARY OF ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES <br /> Significance Significance <br /> Potential Impact Before Mitigation Measures After <br /> Mitigation Mitigation <br /> Measures Measures <br /> needed to safely accommodate truck turning <br /> movements associated with the project. <br /> 2. In the event that the project queuing requirements <br /> extend off-site, the ODS shall be responsible for <br /> preparing and implementing a truck metering plan <br /> that minimizes off-site queuing. <br /> Parking Impacts LS None required <br /> 16. UTILITIES/SERVICES SYSTEMS <br /> Sewer Services PS 1. The ODS shall submit sewer background LS <br /> documentation along with calculations to the <br /> Municipal Utilities Department. If documentations <br /> shows that a Waste Discharge Permit is required, the <br /> ODS shall provide such Permit to the Municipal <br /> Utilities Department prior to the approval of <br /> improvement plans. <br /> Water Services LS None required <br /> Storm Drainage Services PS 1. The ODS shall submit detailed improvement plans. LS <br /> These plans shall show all off-site utilities necessary <br /> to provide water, storm and sanitary sewer utility <br /> service. These plans shall be acceptable to the <br /> Director of Municipal Utilities and approved by the <br /> City Engineer prior to the approval of improvement <br /> plans. <br /> Solid Waste LS None required <br /> 121339/ST011R226 1-13 October 14, 2011 <br /> Copyright 2011 Kleinfelder <br /> Bright People.Bight Solutions <br />