My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014 NOV TPR
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
Archieved Reports
>
ARCHIVED REPORTS_2014 NOV TPR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 3:14:45 PM
Creation date
7/3/2020 11:14:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014 NOV TPR
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0440011_9999 S AUSTIN_2014.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Monitoring Program(MITIGATION MONITORING AND REPORTING PROGRAM: <br /> CONSOLIDATED FORWARD LANDFILL PROJECT). The applicant and the Community <br /> Development Department shall annually review the program. Not less than 30 days nor more <br /> than 60 days prior to the first anniversary date of this approval, and each anniversary date <br /> thereafter,the applicant shall submit to the Gommunity Development Department a letter setting <br /> forth the applicant's good faith compliance with the terms and conditions of the program. <br /> Community Development Department staff will visit the site semi-annually.,All costs incurred by <br /> the Community Development Department for the semi-annual monitoring and the annual review <br /> shall be bome by the applicant. The costs may include costs of Community Development <br /> Department staff and administrative time and direct out-of-pocket costs and expenses, including <br /> costs of consultants and non-department personnel. Community Development Department staff <br /> time may Include overhead costs and will be consistent with Department policy. <br /> g. MITIGATION MEASURES: The following mitigation measures identified In the Final <br /> Environmental Impact Report:Consolidated Forward Landfill Project(SCH#2001052081), <br /> November 2002 are adopted as conditions of approval: <br /> N( DISE) <br /> (1) 6(C.3) <br /> Identified in EIR: <br /> (a) Heavy equipment operations shall not be conducted within 1500 feet of any occupied <br /> residence after 10 p.m. and before 6 a.m.;of <br /> (b) Equipment operations within 1500 feet of any residence after 10 p.m. or before 6 a.m. <br /> shall be fully shielded from the direct fine of sight to the residence by an earthen berm whose <br /> crown elevation exceeds the elevation of the top of the exhaust stack. <br /> (2) T Forward 1993(E3) <br /> The landowner and tenant at R1 (reskfence at 9690 Austfn'Road)shalt be provided with the <br /> option of requesting a sound wall to redw a noise exposure both in the front yard and within <br /> the home. Table III.E.B in the Draft OR shows the noise reduction provided by a variety of <br /> different sound wall designs The foo&wtes to Table IILE.B describes the alternative designs <br /> in detail). Note that any of these de-<Va+s will be more than sufficient to reduce project noise I <br /> Impacts below a level of signifrcarrce <br /> (3) 8 Forward 4993(E1) <br /> The contractor shall be required to effpby the quietest among alternative equipment or to <br /> mutde%ntrol noise from available went. <br /> (4) 9 Forward 1993(E2) <br /> Muffling of equipment used on site shag be maintained to factory specifications. <br /> (5) 10 Austin 1994(H1.a)(similar),Austin 2000(Ml.a) <br /> The proposed project must conform to the San Joaquin County Noise Standards contained in <br /> the County's General Plan. The profiact sponsor shall be required to demonstrate compliance <br /> with this performance standard. Work areas could be limited, work times close to the <br /> residence could be rescheduled, noise barriers such as earth berms could be designed, and <br /> noise monitoring shall be undertaken to demonstrate compliance in the event noise <br /> complaints are received. <br /> (6) 11 Austin 1994(H1.b),Austin 2400(Hl.b) <br /> It project-related noise levels measured at the property line of any residential use would <br /> San Joaquin County UP-00-7, ER-00-21Forward, Inc. <br /> Community Development Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.