My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014 NOV TPR
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
Archieved Reports
>
ARCHIVED REPORTS_2014 NOV TPR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 3:14:45 PM
Creation date
7/3/2020 11:14:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014 NOV TPR
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0440011_9999 S AUSTIN_2014.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> CIWMB that it has been placed in the operating record. <br /> Identified in EIR: <br /> The project sponsor shall include downward shielding of new landfill lighting,and shall abide <br /> by any additional reasonable and feasible measures, including reducing or eliminating lighting <br /> during foggy conditions,chat are designated by the Federal Aviation Administration (FAA) and <br /> Stockton Metropolitan Airport to mitigate lighting impacts that could be caused by the <br /> proposed project. <br /> 5. REGIONAL WATER QUALITY CONTROL BOARD(Staff Contact: Ross Atkinson,916-255-3000) <br /> a. 1 (A.3) <br /> Proposed as Part of the Project: <br /> Existing measures to discourage birds from the landfill will be continued. Surface area of <br /> ponds will be limited to the extent feasible. <br /> b. 44(F.1) <br /> Proposed as Part of the Project: <br /> As part of the design plans for the proposed landfill, Forward Landfill completed calculations <br /> of the 1000-year peak discharges. The hydraulic and drainage study was used to design <br /> appropriate drainage controls. Drainage controls were designed to prevent contact between <br /> surface water and refuse. Site run-on and run-off control facilities consist of drains and <br /> perimeter ditches that channel surface water to lined holding and evaporation ponds on the <br /> site. The surface-water collection drain system will be designed to divert the water to the <br /> storm water collection basin in the southwest comer of the current Austin Road Landfill, at <br /> times when enough surface water accumulates to have discharged into the collection basin. <br /> All waste at the proposed Forward Landfill will be separated from the north and south <br /> branches of Littlejohns Creek by.a levee system or other acceptable method designed to <br /> protect the site from a 100-year flood event. <br /> The project includes channel reconfiguration and localized flood protection berms to isolate <br /> the landfill surfaces from floodwaters. <br /> The project design also includes provision of replacement floodplain area and storage volume <br /> in an easement along the relocated North Branch of the South Fork of South Littlejohns <br /> Creek. <br /> The channel and floodplain storage easement are designed to accommodate the 100-year, <br /> 24-hour storm. The design also includes a three-foot freeboard. <br /> c. 45(F.2) <br /> Proposed as Part of the Project: <br /> The JTD articulates the programs of drainage control structures and monitoring to inhibit <br /> erosion and sedimentation. Proposed structural controls include the drainage control system <br /> and daily cover. Operational controls include maintenance of the drainage system,by <br /> keeping ditches clear of debris and excessive vegetation,and making needed repairs to <br /> drainage structures. Corrective measures will be implemented if inspections show excessive <br /> erosion or damage to drainage channels. Eroded areas will be mitigated by removing loose <br /> debris followed by replacement,regrading,and compacting the area. Monitoring and <br /> protection against sediment from entering the Littlejohn stream channel will be implemented, <br /> including the diversion of part of Littlejohns Creek farther away from the landfilled area. <br /> In order to minimize sediment transport to the Littlejohns Creek, landfill slopes,ridgetops, and <br /> San Joaquin County UP-00-7, ER-00-21Forward, Inc. <br /> Community Development Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.