Laserfiche WebLink
Contsolidated Forward Landfill Project—Mitigation Monitoring;and Reporting;Program CheckliKt Page 24 <br /> implementuflon <br /> Mitigation Measure Iniplenicutnfion Monitoring Confirmutton Comments <br /> MITIGATION MONITORING AND REPORTING PROGRAM CHECKLIST <br /> INTRODUCTION: <br /> This Mitigation Monitoring and Reporting Program Checklist includes mitigation measures identified in this MR,as well as mitigation measures from three <br /> previous EIRs prepared for the project site,identified below as"Forward 1993","Austin 1994",and"Austin 2000". These three previous MRs are discussed in <br /> more detail in the introduction to Attachment I Mitigation Measures,above. <br /> Mitigation measures are grouped by the impact categories used in this EM and numbered sequentially. <br /> Mitigation Measures from this EIR are printed in normal font,with the original Mitigation Measure numbers from this MR following in(parentheses). Mitigation <br /> measures from the three previous EIRs are printed in italics and identified by their source(Forward 1993,Austin 1994,or Austin 2000),followed by the Mitigation <br /> Measure number in the relevant MR. Because some impacts in this EIR and in previous EIRS do not require mitigation measures,the original mitigation measure <br /> numbers are not sequential. <br /> In some cases,mitigation measures from two or more of the previous EMBs tint are substantially similar in content,or have Wen updated without otherwise being <br /> changed,have been combi "similar"and/or These mitigation measures are identified as"similaand/or"updated". Mitigation measures from the three previous MIIts that <br /> have been replaced by equivalent measures in this BIR,or have already been implemented,are excluded from the list below. <br /> A. LAND USE,PLANS, <br /> AND POLICIES <br /> 1 (A..3) Bird I Tara rds <br /> Continue existing Responsibility: Landfill operator Iteslwnsihilily:suit Joaquin County <br /> bird control nieasures 'Tinting:Ongoing linvironmental l lealth Department <br /> Timing: During monthly site visits <br /> Limit surface of ponds Responsibility:Landfill operator Responsibility:RWQCB <br /> Tinting:The area ofproposed and Timing:Prior to approval of Waste <br /> existing ponds shall be shown on any Discharge Requirements(WDRs) <br /> grading permits submitted to the <br /> County <br /> Bird survey Responsibility:Landfill operator Responsibility:San Joaquin County <br /> Timing:.Upon approval of Use Permit 1-tivironmuntul I lealth De purlrnent <br /> and prior to approval of business license Timing:Prior to approval of <br /> business license <br />