My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014 NOV TPR
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
Archieved Reports
>
ARCHIVED REPORTS_2014 NOV TPR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 3:14:45 PM
Creation date
7/3/2020 11:14:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014 NOV TPR
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0440011_9999 S AUSTIN_2014.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
— � d e Checklist Page 38 <br /> Consolidated Forward Landfill Project Mitigation Monitoring an Reporting Program g <br /> Implementation <br /> Mitigation Measure Implementation Monitoring Confirmation Comments <br /> (AB 1760) Timing.Prior to approaal of Environmental Health Department <br /> Solid Waste,Pacilities Permit(SWFP) Timing:Prior to Approval of <br /> Solid Waste Facilities Pennit(SWFP) <br /> 54 Forwarr11993(0) <br /> Secondary containment Responsibility:Landj711 operator Responsibility:Sart Joaquin County <br /> for diesel fuel riming.- Secondary containment shall be Environmental Health Department <br /> shown on Improvement Plan listing: During monthly site visits <br /> G.SOILS AND GLOLOGY <br /> 55(G.2)Alternative daily cover Responsibility:Landfill operator Responsibility.CIWMB <br /> Timing:If and as needed Timing:If and as needed <br /> 56(G.3)Modify seismic design Responsibility.Landfill operator Responsibility:RWQCB and CIWMB <br /> if needed Letters from RWQCB and CIWMB Timing:Prior to issuance of <br /> approving seismic design shall be Waste Discharge Requirements(WDRs) <br /> included with the Improvement Plan <br /> Monitor liner and Responsibility:Landfill operator Responsibility:RWQCB and C1WMI1 <br /> druinage system 'I'Inting:As determined by RWQCB Tlniing:Annnally <br /> and/or CIWMB <br /> 57(G.4)Seismic design Responsibility:Landfill operator Responsibility:RWQCB and CIWMB <br /> requirements of Timing:Letters fromRWQCB and CIWMB Timing-g:Prior to issuance of <br /> Title 27 approving seismic design shall be Waste Discharge Requirements(WDRs) <br /> included with the Improvement Plan and Solid Waste Facilities Permit(SWFP) <br /> 58(0.5)Implement erosion Responsibility:Landfill operator Responsibility:RWQCB <br /> management plan Timing:Daily Timing:Annually <br /> Revegetate completed Responsibility;Landfill operator Responsibility: RWQ01 <br /> cells 'Timing:I1pon completion of each cell 'riming:Annually <br /> Rrosion controls on Responsibility: Landtlll operator Responsibility:RWQCB <br /> temporary ryslo slopes riming:Upon <br /> construction of Timing:Annually <br /> temporary slopes <br /> Monitoring or erosion Responsibility:Landfill operator Responsibility: RWQCB <br /> control measures Timing:Daily,and for at least Timing:Annually,ibr at least <br /> f <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.