Laserfiche WebLink
— � d e Checklist Page 38 <br /> Consolidated Forward Landfill Project Mitigation Monitoring an Reporting Program g <br /> Implementation <br /> Mitigation Measure Implementation Monitoring Confirmation Comments <br /> (AB 1760) Timing.Prior to approaal of Environmental Health Department <br /> Solid Waste,Pacilities Permit(SWFP) Timing:Prior to Approval of <br /> Solid Waste Facilities Pennit(SWFP) <br /> 54 Forwarr11993(0) <br /> Secondary containment Responsibility:Landj711 operator Responsibility:Sart Joaquin County <br /> for diesel fuel riming.- Secondary containment shall be Environmental Health Department <br /> shown on Improvement Plan listing: During monthly site visits <br /> G.SOILS AND GLOLOGY <br /> 55(G.2)Alternative daily cover Responsibility:Landfill operator Responsibility.CIWMB <br /> Timing:If and as needed Timing:If and as needed <br /> 56(G.3)Modify seismic design Responsibility.Landfill operator Responsibility:RWQCB and CIWMB <br /> if needed Letters from RWQCB and CIWMB Timing:Prior to issuance of <br /> approving seismic design shall be Waste Discharge Requirements(WDRs) <br /> included with the Improvement Plan <br /> Monitor liner and Responsibility:Landfill operator Responsibility:RWQCB and C1WMI1 <br /> druinage system 'I'Inting:As determined by RWQCB Tlniing:Annnally <br /> and/or CIWMB <br /> 57(G.4)Seismic design Responsibility:Landfill operator Responsibility:RWQCB and CIWMB <br /> requirements of Timing:Letters fromRWQCB and CIWMB Timing-g:Prior to issuance of <br /> Title 27 approving seismic design shall be Waste Discharge Requirements(WDRs) <br /> included with the Improvement Plan and Solid Waste Facilities Permit(SWFP) <br /> 58(0.5)Implement erosion Responsibility:Landfill operator Responsibility:RWQCB <br /> management plan Timing:Daily Timing:Annually <br /> Revegetate completed Responsibility;Landfill operator Responsibility: RWQ01 <br /> cells 'Timing:I1pon completion of each cell 'riming:Annually <br /> Rrosion controls on Responsibility: Landtlll operator Responsibility:RWQCB <br /> temporary ryslo slopes riming:Upon <br /> construction of Timing:Annually <br /> temporary slopes <br /> Monitoring or erosion Responsibility:Landfill operator Responsibility: RWQCB <br /> control measures Timing:Daily,and for at least Timing:Annually,ibr at least <br /> f <br /> I <br />