Laserfiche WebLink
ATTACH=. E <br /> CONSOLIDATED FORWARD LANDFILL PROJECT <br /> FINAL ENVIRONMEKZ AL LMPACT REPORT <br /> ERRATA <br /> The Heading"E.Public Health and Safety"i.as inadvertently omitted L-om Tablell-1,p.: <br /> 11 of the FEIR. <br /> In addition,the first paragraph under'Proposed as Part of the Project"on that page,as <br /> well as the paragraph extending from the bottom of page 129 onto the top of p.130,and <br /> the first paragraph under"E.Public Health and Safety" on p.7 of Appz-zdix G, <br /> Mitigation Monitoring and Reporting Program" in the FEIR are all corrEc-ted for clarity <br /> to read as follows: <br /> Use a total of 17 pieces of equipment(at an^y given time)over the life er the project to <br /> minimize particulate discharge. As sho-urn in Table IV.E-1, (FEIR,p 129), the risk frclm <br /> particulate-and specifically diesel fitmes-mill be lessened for the project versus the <br /> baseline conditions. The existing 28 piecesdiesel powered landfill oFerating equipment <br /> mull be changed out even]5 years at Forrard and even]10 years at Au:-fin,mud-mould be <br /> reduced to a total of 17 pieces of equipmei t over a 1-5-year or fencer. <br /> In addition,the last paragraph on page 128 is corrected to read as follow.s: <br /> T1w risks are considered to be reduced in the proposed project compared to the baselinre <br /> permit conditions because:l)A lesser amount of particulate-generating equipment used <br /> per ton disposed of 2)Waste will be moved oraer a shorter period of tures (14 versus 30 in <br /> years)and daily hours of equipment operation will be only slightly increased rather flue <br /> proportionally increased(10.5 versus 9.0 hours per day),and;3)the risk protocols <br /> evaluates exposure over a 30 year timefrrnnoe and the project tuould only result in diesel <br /> emissions for 14 years while the continued torn-level operations of Austin Road landfill <br /> under existing permits mould occur for the entire 30-year exposure period. <br /> The FEIR inadvertently had 30-year lifetimes for both•the proposed project and existing <br /> Austin Road landfill. The proposed project wroald have a 14-year operational lifespan. <br /> The minutes of the San Joaquin County Planning Commission's October 3,2002 Hearing <br /> on the Draft Environmental Impact Report(EIR)for the Consolidated Forward Landfill <br /> Project were inadvertently omitted from Section DC,Comments and Responses,of the - <br /> Final Environmental Impact Report Those minutes are attached and incorporated by <br /> reference into the Final EIR as Item A(1)followving page 236 of the Final EIR. Because no <br /> environmental issues or questions are raised in the Commissioners' comments,no <br /> response is required. <br />