Laserfiche WebLink
San Joaquin Valley <br /> Air Pollution Control District <br /> PERMIT UNIT: N-8534-2-1 EXPIRATION DATE: 06130/2017 <br /> EQUIPMENT DESCRIPTION: <br /> WINDROWOPEN DENTT WATER NG SYSTEM SERVING THE ACTIVE-PHASE COM COMPOSTING WINDROW PIL SON WITR <br /> AN <br /> INDEPENDENT <br /> PERMIT UNIT REQUIREMENTS <br /> 1. No air contaminant shall be released into the atmosphere which causes a public nuisance.[District Rule 4102] <br /> 2. No air contaminant shall be discharged into the atmosphere for a period or periods aggregating more than three <br /> minutes in any one hour which is as dark as,or darker than,Ringehnann l Or 20%opacity. [District Rule 4101] <br /> 3. All materials for processing shall be maintained adequately moist to prevent visible emissions in excess of 20% <br /> opacity.[District Rule 4101] <br /> 4. PM10 emissions from the organic material composting operation shall not exceed 0.7 pounds in any single day. <br /> [District Rule 2201] <br /> VOC emissions from the organic material composting operation shall not exceed 1,981.4 pounds in any single day. <br /> [District Rule 2201] <br /> 6. The total quantity of organic materials composted shall not exceed 95,000 wet-tons in any one calendar year. [District <br /> Rules 2201 and 4566] <br /> 7. The operator shall implement at least three turns of each organic waste material composting windrow during the <br /> active-phase of the composting process.[District Rule 4566) <br /> S. The operator shall install,maintain and utilize an independent watering system to apply water to the surface of each <br /> active-phase composting windrow prior to turning. The operator shall test each windrow within three hours before <br /> turning for adequate water by taking a sample of the organic material in the windrotiv and passing a"Ball Test". The <br /> "Ball Test" is performed by taking a sample of the compostable material from at least three inches below the surface, <br /> between the vertical midpoint and the peak of the windrow and forming the sample into using hand pressure. There <br /> should be at least enough water in the material to form a ball when compressed by hand,but the ball may break when <br /> tapped. If the material cannot form a ball or crumbles during the ball test,then application of additional water to the <br /> windrow prior to turning is required until the material passes the ball test. If a rain event occurs prior to turning the <br /> windrow,application of additional water to the surface of the windrow will not be required if the material passes the <br /> ball test as previously described.[District Rules 1070 and 4566) <br /> 9. A daily operations log shall be maintained and shall include the following:(a)The date and time the organic materials <br /> from the windrow was tested for adequate water content the"ball test"and indicate if the material passed the ball test. <br /> If the windrow material did not pass the ball test indicate the corrective actions taken;(b)The date and time each <br /> windrow was turned;(c)Total quantity of organic material transferred from the stockpiles to the active-please <br /> composting windrows(in wet-tons);(d)Total quantity of active-phase composting windrows(in Nvet-tons);(e)Total <br /> quantity of curing-phase composting windrows(in wet-tons)and(f)Any other information necessary to demonstrate <br /> compliance with Rule 4566.[District Rules 1070 and 4566] <br /> PERMIT UNIT REQUIREMENTS CONTINUE ON NEXT PAGE <br /> These terms and conditions are part of the Facility-wide Permit to Operate. <br /> Facility Name: FORWARD,INC.COMPOSTING FACILITY <br /> .. ......wn wncr ionanAAANTMA GA 05338 <br />