Laserfiche WebLink
STATE OF CALIFORNIA GEORGE DEUKMEJIAN, Governor <br />CALIFORNIA WASTE MANAGEMENT BOARD <br />7, <br />1020 NINTH STREET, SUITE 300 <br />SACRAMENTO, CALIFORNIA 95814 <br />Mr. Joseph Betts, President <br />Delta Paper Stock Company <br />P. O. Box 6533 <br />Stockton, CA 95206 <br />P';C'R 4 1989 <br />RE: Initial Inspection of Independent Trucking Inc. Transfer <br />Station, Facility No. 39 -AA -0016 <br />Dear Mr. Betts: <br />California Waste Management Board (Board) staff conducted an <br />initial field inspection of the Independent Trucking Inc. <br />Transfer Station on February 23-24, 1989, pursuant to Government <br />Code, Sections 66796.10(a), 66796.35, 66796.38 and 66796.67. <br />This inspection initiates the current state evaluation cycle of <br />the facility. A copy of the State Inspection Report is enclosed. <br />The following violations of the State Minimum Standards (Title <br />14, California Code of Regulations, Chapter 3) were documented <br />during the inspection of the facility: <br />17441 - Report of Station Information <br />17482 - Entry Signs <br />17514 - Parking <br />In addition, areas of concern were noted with the following <br />sections of the State minimum Standards: <br />17452 - General Design Parameters <br />17485 - Visual Screening <br />17512 - Cleaning <br />17519 - Processing Operations <br />17557 - Station Maintenance Program <br />Please consult with your local enforcement agency (LEA) and work <br />with them to develop a compliance agreement which sets forth the <br />actions you will take to achieve compliance with State Minimum <br />Standards. The compliance agreement must contain an action plan <br />for correcting each violation and area of concern. <br />Each action plan must contain a description of the corrective <br />work to be conducted, an implementation schedule and a specific <br />date by which the violation or area of concern will be completely <br />corrected. Each action plan must also outline a program for <br />assuring continued compliance, including a description of the <br />resources, equipment, personnel and quality control measures to <br />be ethployed. It is not acceptable to simply state that you will <br />henceforth comply with a particular standard. <br />