Laserfiche WebLink
0 0 <br />7. Other permits/reviews required by the City, County, State, Federal and/or other agencies for project <br />implementation: <br />Agency:. L r <br />at All e_ 0 � 1 1 !2 <br />:t sic Ck— <br />TIM-111111.1tFIET: <br />Permits/Reviews: <br />General Plan Designations Acres Zoning Districts <br />to to <br />to to <br />Acres <br />9. Describe any site alterations which result from the proposed project (specifically address the amount and <br />location of grading, cuts and fills, vegetation removal, alterations to drainage, removal of existing structures, <br />number of trees removed, <br />10. Specific Project Description/Operational Characteristics: <br />a. Describe proposed Commercial, Industrial and Institutional uses (includes recreational and other non- <br />residential uses): <br />Proposed <br />(1) Proposed Land Uses) Zonin2 <br />i\11A <br />Totals: <br />(2) Describe project phasing (location/timing): <br />Site Structure Required Parking <br />Acreage Sg. Ft. - Parking Provided <br />(3) Hours of operation: _0,00-CCCL = ip, Am 3 <br />(4) Number of employees/work shifts: 451X, <br />(5) Number of company vehicles/trucks: ') I <br />(6) Estimated number of vehicle trip ends (TE) per day generated by proposed project: <br />Truck Trips / 0 TE/Day; Passenger Vehicles 0" TE/Day; Total /0 TE/Day <br />(7) Estimated maximum number of TE/Day based on proposed General Plan Designation: <br />TE/Day and/or Proposed Zoning TE/Day <br />0 <br />