Laserfiche WebLink
D:WIJUu.TS\DESCALC2 rev 7/26193 TABLE I.D.2-DESIGN <br /> DESIGN CAPACITY CALCULATIONS <br /> LOVELACE ROAD TRANSFER STATION <br /> BY MJU CHECKED BY <br /> A GATE QUEING PROVIDED NOTES SOURCES <br /> Non-Automated Disposal 45 Spaces (1) <br /> Automated Disposal 14 Spaces (2) <br /> 1 Based on 30 ft.per vehicle and 1350 ft public lanes. <br /> 2 Based on 55 A:per vehicle and 770 ft public lanes. <br /> B THEORTICAL GATE PROCESSING CAPACITY <br /> Non.Automated Disposal <br /> Transaction processing/vehicle 4 Secxnds A <br /> Loads per hour processing 80 Loads per hour <br /> CY per Load 2.11 CY/LOAD <br /> TONS per Load 0.46 tons/Load pg 16 B <br /> Capacity » TONSAIOUR <br /> TPD 9 hours ..... [< ...... PD <br /> 3 CALCULATION TABLE FOR AVERAGE LOAD VOLUME(from 8) (3) B <br /> loads 98398 <br /> Volume 207482 cy <br /> VOL/LOAD 2.11 CY&OAD <br /> ............................... <br /> Automated Transaction processing/vehicle :Seconds A <br /> Loads per hour processing 80 Loads per hour <br /> TONS per Load ............,.4.95 tons/Load pg 16 B <br /> CapacityTONS/HOUR <br /> 11 hours TPD <br /> 4 CALCULATION TABLE FOR A VERA GE LOAD VOLUME(from 8) (4) B <br /> loads 16736 <br /> Volume 82812 TONS <br /> VOL&OAD 4.95 TONSVLOAD pg 16 B <br /> C THEORETICAL TIPPING UNLOADING CAPACITY <br /> ..........................I...I <br /> Non Automate Unloading Time .._.._..._ ;. <br /> minutes/LOAD A <br /> tons/load 0.46 tons/LOAD pg 16 B <br /> Space 24 Unloading Stalls <br /> 96.Loads per hour <br /> CAPACITY __.;<<:<;:::i+d4TONSMR... <br /> 9 hours 4;TPD <br /> Automated Unloading Time '15iminut OAD A <br /> tonsAoad 4.95 tons/LOAD pg 16 B <br /> Space 9 Unloading Stalls <br /> 36 Loads per hour <br /> CAPACITY «><:::.7Q;TON........R........... <br /> ....::.:.........::............ <br /> TPD 11 hoursTPD <br /> A Based on CSWD observations of average processing or unloading times. <br /> B 1991 Waste Quantity Report <br /> San Joqauin County Desprtment of Public Works,May 1992 <br /> General Slight rounding errors(not significant for the ana ' )are displayed in the calcuation sheet. <br />