Laserfiche WebLink
WASac9T cell a70 REV.612193 <br /> TABLE I.D.2.b.High PROJECTION OF STATION VOLUMES USING HIGH ESTIMATES <br /> D:IMJUXLTSIRSICALCS CALCULATION <br /> A Projected Waste Percentage increases <br /> YEAR LOW Percent increase HIGH Percent increase <br /> TONS Annual . Annual <br /> 1991 actual 127,652 <br /> 1995 142,882 11.93% 165,756 29.85% <br /> 2000 121,813 -4.57% 199,041 55.92% <br /> 2005 132,639 3.91% 216,731 69.78% <br /> 2010 143,465 12.39% 234,420 83.64% <br /> B ESTIMATED ANNUAL VEHICLE WASTE TONNAGES BY TYPE(Assuming high projections) <br /> 0.237359 CONV FAC cyttons SELF HAU (Minimum Fee) <br /> Auto Small PU Large PU Trailer Van TOTALS <br /> Percent(1991) 2% 34% 44% 16% 5% 100% <br /> 1991 659 10,580 13,520 4,891 1,412 31,062 <br /> 1995 29.85% 855 13,738 17,555 6,351 1,834 40,334 <br /> 2000 55.92% 1,027 16,497 21,081 7,626 2,202 48,433 <br /> 2005 69.78% 1,118 17,963 22,954 8,304 2,398 52,738 <br /> 2010 83.64% 1,210 19,430 24,828 8,982 2,594 57,042 <br /> WEIGHED VEHICLES <br /> Rear Load Front Load Side Load Roll Off Other TOTALS <br /> Percent(1991) 15% 22% 26% 13% 25% 100% <br /> 1991 14,077 20,874 24,562 12,057 24,391 95,961 <br /> 1995 29.85% 18,279 27,105 31,894 15,656 31,672 124,605 <br /> 2000 55.92% 21,950 32,548 38,298 18,800 38,032 149,627 <br /> 2005 69.78% 23,900 35,440 41,702 20,471 41,412 162,925 <br /> 2010 83.64% 25,851 38,333 45,106 22,141 44,792 176,223 <br /> SELF HAUL(WEIGHED OR MEASURED) <br /> Weighed Measured TOTALS <br /> 1991 13,151 628 13,779 <br /> 1995 29.85% 17,077 815 17,892 <br /> 2000 55.92% 20,506 979 21,485 <br /> 2005 69.78% 22,328 1,066 23,394 <br /> 2010 83.64% 24,150 1,153 25,304 <br /> NOTES <br /> 1 Annual tonnages projected for low estimates are based on CSWD projections <br /> assuming that emphasis is placed on recycling programs in waste shed in order <br /> to implement goals of AB 939. <br /> 2 Annual tonnages projected for LOW estimates(OTHER TABLE)are based on CSWD projections <br /> assuming that limited emphasis is placed on recycling programs in waste shed in order <br /> to implement goals of AB 939. <br /> 3 Waste quantity projection are taken from CSWD 1990 annual waste quantity report. <br /> 4 Waste quantities for 1991 are taken from 1991 annual report by CSWD. <br />