Laserfiche WebLink
TRIPRA92"cell al rev.6/2193 <br /> Table I.E.Iow PROJECTION OF STATION IRIPS USING LOW ESTIMATES <br /> D:\MJU\LTS\CALCSI CALCULATION <br /> A Projected Waste Percentage increases <br /> YEAR LOW Percent increase HIGH Percent increase <br /> TRIPS Annual Annual <br /> 1991 actual 127.652 <br /> 1995 142,882 11-93% 165,756 29.85% <br /> 2000 121,813 -4.57% 199,041 55.92% <br /> 2005 132,639 3.91% 216,731 69.78% <br /> 2010 143,465 1Z39% 234.420 83.64% <br /> B ESTIMATED ANNUAL VEHICLE TRIPS BY TYPE(Assuming LOW projections) <br /> 0.237359 CONV FAC cytons SELF HAU (Minimum Fee) <br /> TONS Auto Small PU Large PU Trailer Van TOTALS <br /> Percent(1991) 3% 50% 32% 12% 3% 100% <br /> 1991 2,775 44,550 28,477 10,303 2,975 89,080 <br /> 1995 11.93% 3,106 49,865 31,875 11,532 3,330 99,708 <br /> 2000 -4.57% 2,648 42,512 27.174 9,832 2,839 85,005 <br /> 2005 3.91% 2,883 46,290 29,590 10,706 3,091 92,560 <br /> 2010 12.39% 3,119 50.069 32,005 11,579 3,344 100,115 <br /> WEIGHED VEHICLES <br /> Rear Load Front Load Side Load Roll Off Other TOTALS <br /> Percent(1991) 8% 11% 13% 40% 28% 100% <br /> 1991 1,917 2,810 3,375 10,167 7,041 25,310 <br /> 1995 11.93% 2,146 3,145 3,778 11,380 7,881 28,330 <br /> 2000 4.57% 1,829 2.681 3,221 9,702 6,719 24,152 <br /> 2005 3.91% 1,992 2,920 3,507 10,564 7,316 26,299 <br /> 2010 12.39% 2,154 3,158 3,793 11,426 7,913 28,445 <br /> SELF HAUL(WEIGHED OR MEASURED) <br /> Weighed Measured TOTALS <br /> 1991 7,517 1,801 9,318 <br /> 1995 11.93% 8,414 2,016 10,430 <br /> 2000 4.57% 7,173 1,719 8,892 <br /> 2005 3.91% 7,811 1,871 9,682 <br /> 2010 12.39% 8,448 2,024 10,472 <br /> NOTES <br /> 1 Annual trips projected for low estimates are based on CSWD projections <br /> assuming that emphasis is placed on recycling programs in waste shed in order <br /> to implement goals of AS 939. <br /> 2 Annual trips projected for high estimates(OTHER TABLE)are based on CSWD projections <br /> assuming that limited emphasis is placed on recycling programs in waste shed in order <br /> to implement goals of AS 939. <br /> 3 Waste quantity projection are taken from CSWD 1990 annual waste quantity report. <br /> 4 Waste quantities for 1991 are taken from 1991 annual report by CSWD. <br />