Laserfiche WebLink
TABLE III.C3.a.- 35% I STATION WASTE FLOW QUANTITIES <br /> d:\rnju\Its\calc\wasact9l(cella250) rev. 9/17/93 <br /> PATH DESCRIPTION STATION WASTE FLOW QUANTITIES PD <br /> Year 1995 Year 2000 Year 2010 <br /> DELIVERYITRANSFER Low High Low High Low High <br /> 1 Automated Gate/Tipping Gate/Tipping321.6 373.1 274.2 448.0 322.9 527.7 <br /> 2 Non-Automated Gate 137.9 160.0 123.8 192.1 138.4 226.2 <br /> 3 Non-Automated Tipping 137.2 158.4 123.2 190.2 137.8 224.0 <br /> 4 Public Drop-off 0.7 1.6 0.6 1.9 0.7 2.3 <br /> 5 Transfer 298.0 344.9 258.1 414.2 299.2 487.8 <br /> 6 Tare Weighing N/A NIA N/A N/A NIA N/A <br /> DEPARTURES/RECYCLING <br /> 7 Storage Area Removal 160.8 186.6 139.3 224.0 161.5 263.9 <br /> 8 Drop-off removal 0.7 1.6 0.6 1.9 0.7 2.3 <br /> 9 <br /> Special Waste Removal <br /> 10 Returns to Gate N/A N/A N/A N/A N/A N/A <br /> NOTES <br /> 1. Assumes daily projections in TDP. Note that projections are conservative in that estimates for commercial are <br /> based on commercial averages over 286 days versus 364 days for public. This results in slightly higher totals <br /> over an average based on annual Station totals divided by the 364 operational days. <br /> 2. Public Drop-off quantities assume the following percentages of total Non-Automated Station disposal quantities <br /> are deposited in the public drop off area. <br /> 0.5% for"Low"incoming waste projections <br /> 1.0% for"High"incoming waste projections <br /> 3. Recycling storage area removal assumes the following diversion percentages. <br /> Year 19951 20001 2010 <br /> Diversion 1 35% 35% 35% <br /> 4. Daily waste removal trips assuming"High"incoming waste quantifies <br /> Year 19951 20001 2010 <br /> Tris 43 52 61 <br /> Assumptions: <br /> 35 CY bin <br /> 250 average Ibs/CY <br />